EP3551833B1

Thru-tubing retrievable subsurface completion system

Abstract

This record has no abstract on file.

EP3551833B1, drawing sheet 1
Sheet 1 of 8

Term

11.2 yearsleft in the term

Expires 5 December 2037.

  1. Priority
  2. Filed
  3. Granted
  4. Today
  5. Expires

11 claims: 10 independent, 1 dependent

  1. 1
    A sub-surface completion unit, SCU, system configured to be disposed in a target zone of a wellbore (110) of a well to provide completion operations in the target zone, the SCU system comprising:a SCU body (130) configured to be disposed in a target zone of a wellbore of a well;a SCU wireless transceiver coupled to the SCU body and configured to communicate with a surface control system of the well by way of wireless communication with a down-hole wireless transceiver disposed in the wellbore of the well;one or more SCU anchoring seals (128) coupled to the SCU body and configured to be positioned in an un-deployed position and a deployed position, the un-deployed position of the one or more SCU anchoring seals enabling the SCU to pass through production tubing (118) disposed in the wellbore of the well, and the deployed position of the one or more SCU anchoring seals providing a seal against a wall of the target zone of the open-holed portion of the wellbore to provide zonal isolation between regions in the wellbore;and one or more SCU centralizers coupled to the SCU body and configured to be positioned in an un-deployed position and a deployed position, the un-deployed position of the one or more SCU centralizers enabling the SCU to pass through the production tubing disposed in the wellbore of the well, and the deployed position of the one or more SCU centralizers positioning the SCU in the target zone of the open-holed portion of the wellbore, the SCU system configured to pass through the production tubing disposed in the wellbore of the well.
  2. 3
    The system of any preceding claim, wherein the un-deployed position of the one or more SCU centralizers comprises the one or more one or more SCU centralizers having an outer diameter that is less than an inner diameter of the production tubing, and wherein the deployed position of the one or more one or more SCU centralizers comprises the one or more one or more SCU centralizers having an outer diameter that is equal to or greater than an inner diameter of the wall of the target zone of the open-holed portion of the wellbore.
  3. 4
    The system of any preceding claim, wherein at least one of the one or more anchoring seals is retrievable, and wherein the at least one of the one or more anchoring seals that is retrievable is configured to be removed from the target zone with a body of the SCU when the body of the SCU is removed from the target zone.
  4. 5
    The system of any preceding claim, wherein at least one of the one or more anchoring seals is detachable, and wherein the at least one of the one or more anchoring seals that is detachable is configured to detach from a body of the SCU and remain in the target zone when the body of the SCU is removed from the target zone
  5. 6
    The system of any preceding claim, wherein the deployed position of the one or more SCU anchoring seals is configured to isolate a region of the target zone comprising a breakthrough of a fluid to inhibit the fluid of the breakthrough from flowing into the wellbore.
  6. 7
    The system of any preceding claim, wherein the SCU comprises a plurality of SCU modules, SCUMs, assembled to one another, and wherein the plurality of SCUMs are configured to be assembled to one another prior to the SCU being passed through the production tubing to form the SCU prior to the SCU being passed through the production tubing.
  7. 8
    The system of any preceding claim, wherein the SCU comprises a plurality of SCU modules, SCUMs, assembled to one another, and wherein the plurality of SCUMs are configured to be advanced through the production tubing unassembled, and to be assembled to one another in the open-holed portion of the wellbore to form the SCU down-hole after the SCUMs are passed through the production tubing.
  8. 9
    The system of any preceding claim, further comprising:the production tubing disposed in the wellbore;the down-hole wireless transceiver disposed at a down-hole end of the production tubing in the wellbore of the well;a positioning device configured to provide a motive force to advance the SCU through the production tubing and the wellbore;and the surface control system of the well.
  9. 10
    The system of any preceding claim, wherein the deployed position of the one or more SCU anchoring seals is configured to isolate a region of the target zone comprising a breakthrough of fluid to inhibit the fluid of the breakthrough from flowing into the wellbore.
  10. 11
    A method of completing a target zone of a wellbore of a well, the method comprising:passing a sub-surface completion unit, SCU, through production tubing (118) disposed in a wellbore of a well, the SCU comprising: a SCU wireless transceiver configured to communicate with a surface control system of the well by way of wireless communication with a down-hole wireless transceiver in the wellbore of the well;one or more SCU anchoring seals (128) configured to be positioned in an un-deployed position and a deployed position, the un-deployed position of the one or more SCU anchoring seals enabling the SCU to pass through the production tubing disposed in the wellbore of the well, and the deployed position of the one or more SCU anchoring seals providing a seal against a wall of the target zone of the open-holed portion of the wellbore to provide zonal isolation between regions in the wellbore;and one or more SCU centralizers configured to be positioned in an un-deployed position and a deployed position, the un-deployed position of the one or more SCU centralizers enabling the SCU to pass through the production tubing disposed in the wellbore of the well, and the deployed position of the one or more SCU centralizers positioning the SCU in the target zone of the open-holed portion of the wellbore;passing the SCU through the wellbore of the well to a target zone of an open-holed portion of the wellbore;deploying the one or more SCU centralizers of the SCU to position the SCU in the target zone of the open-hole portion of the wellbore;and deploying the one or more SCU anchoring seals of the SCU to seal against a wall of the target zone of the open-hole portion of the wellbore to provide zonal isolation between regions in the wellbore.