Perforating gun assembly and method for controlling wellbore pressure regimes during perforating
Abstract
A perforating gun assembly (100) for use in a wellbore. The perforating gun assembly includes a carrier gun body (102) and a charge holder (132) disposed within the carrier gun body (102). A plurality of shaped charges (106-126) are supported within the carrier gun body (102). A secondary pressure generator is operably associated with at least one of the shaped charges. The secondary pressure generator optimizes the wellbore pressure regime immediately after detonation of the shaped charges by controlling the dynamic underbalance created by the empty gun chambers to prevent excessive dynamic underbalance which may detrimentally effect the perforating operation.

Term
3.7 yearsto projected expiry
Projected expiry 24 June 2030, counted from filing; an application has no term until it is granted.
- Priority
- Filed
- Published
- Today
- Projected expiry
1 sheet
Sheet 1
Every citation, both ways
| Document | Relation | Office | Category | Cited during | Relevant claims |
|---|---|---|---|---|---|
| US2009078420A1 | Cites | United States of America | XI | Search report | 1-5,8-13 |
| WO2010065552A2 | Cites | World Intellectual Property Organization (WIPO) | XP | Search report | 1-5,7-13 |
| US4253523A | Cites | United States of America | XA | Search report | 1,5,8 |
16 members in 6 offices
Priority claims8
| Document | Office | Kind | Date |
|---|---|---|---|
| 222106P | United States of America | – | |
| 22210609 | United States of America | P | |
| 512530 | United States of America | – | |
| 51253009 | United States of America | A | |
| 222106P | – | – | – |
| 512530 | – | – | – |
| US20090222106P | – | – | – |
| US20090512530 | – | – | – |
Members16
| Document | Office | Kind | |
|---|---|---|---|
| US2011000669A1 | United States of America | A1 | |
| AU2010202512A1 | Australia | A1 | |
| EP2282003A2 | European Patent Office (EPO) | A2 | |
| US2011209871A1 | United States of America | A1 | |
| BRPI1002493A2 | Brazil | A2 | |
| WO2012154180A1 | World Intellectual Property Organization (WIPO) | A1 | |
| US8336437B2 | United States of America | B2 | |
| US2013000979A1 | United States of America | A1 | |
| US2013008655A1 | United States of America | A1 | |
| US8555764B2 | United States of America | B2 | |
| EP2282003A3This record | European Patent Office (EPO) | A3 | |
| US8739673B2 | United States of America | B2 | |
| US8807003B2 | United States of America | B2 | |
| MY153338A | Malaysia | A | |
| AU2010202512B2 | Australia | B2 | |
| EP2282003B1 | European Patent Office (EPO) | B1 |
71 legal events, as 10 offices reported them to INPADOC
Over the term
Point at a mark for the eventEvents
| Event | Code | Office | |
|---|---|---|---|
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal feeWithdrawnR119 | R119 | DE | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Patent lapsedLapsedMM4A | MM4A | IE | |
| Lapsed because of non-payment of the annual feeLapsedMM | MM | BE | |
| Gb: european patent ceased through non-payment of renewal feeCeasedGBPC | GBPC | EP | |
| Patent ceasedCeasedPL | PL | CH | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| No opposition filedOpposition26N | 26N | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: NO OPPOSITION FILED WITHIN TIME LIMITSTAA | STAA | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| No opposition filed against granted patent, or epo opposition proceedings concluded without decisionGrantedR097 | R097 | DE | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Fee paymentPLFP | PLFP | FR | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Invalidated european patentMG4D | MG4D | LT | |
| Deletion acc. to par. 5 (withdrawal of the translation of the ep patent)MK05 | MK05 | AT | |
| Patent invalid in the netherlands as no translation has been filedMP | MP | NL | |
| Dpma publication of mentioned ep patent grantGrantedR096 | R096 | DE | |
| European patents granted designating irelandGrantedFG4D | FG4D | IE | |
| European patent takes effect as a national patent in ch/liEP | EP | CH | |
| Reference to at number (ep patent enters austrian national phase)REF | REF | AT | |
| Designated contracting statesAK | AK | EP | |
| European patent grantedGrantedFG4D | FG4D | GB | |
| (expected) grantORIGINAL CODE: 0009210GRAA | GRAA | EP | |
| Grant fee paidORIGINAL CODE: EPIDOSNIGR3GRAS | GRAS | EP | |
| Intention to grant announcedINTG | INTG | EP | |
| Despatch of communication of intention to grant a patentORIGINAL CODE: EPIDOSNIGR1GRAP | GRAP | EP | |
| First examination report despatched17Q | 17Q | EP | |
| Request for examination filed17P | 17P | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Search report despatchedORIGINAL CODE: 0009013PUAL | PUAL | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Public reference made under article 153(3) epc to a published international application that has entered the european phaseORIGINAL CODE: 0009012PUAI | PUAI | EP |
Numbers
- Publication
- 2282003
- Publication, DOCDB
- 2282003
- Publication, EPODOC
- EP2282003
- Application
- 101671998
- Application, DOCDB
- 10167199
- Application, EPODOC
- EP20100167199
Titles3
- German
- Bohrlochperforator und Verfahren zur Steuerung des Bohrlochdruckregimes beim Perforieren
- English
- Perforating gun assembly and method for controlling wellbore pressure regimes during perforating
- French
- Ensemble de canon de perforation et procédé de contrôle des régimes de pression dans un puits durant la perforation
Classification
- CPC, 2
- E21B43/117
- E21B43/12
- IPC, 2
- E21B43 117
- E21B43 12
Designated states40
- Contracting states, 37
- Albania
- Austria
- Belgium
- Bulgaria
- Switzerland
- Cyprus
- Czechia
- Germany
- Denmark
- Estonia
- Spain
- Finland
- France
- United Kingdom
- Greece
- Croatia
- Hungary
- Ireland
- Iceland
- Italy
- Liechtenstein
- Lithuania
- Luxembourg
- Latvia
and 13 moreShow fewer
- Monaco
- North Macedonia
- Malta
- Netherlands (Kingdom of the)
- Norway
- Poland
- Portugal
- Romania
- Sweden
- Slovenia
- Slovakia
- San Marino
- Türkiye
- Extension states, 3
- Bosnia and Herzegovina
- Montenegro
- Serbia