CA2401992C

Method for erosion and torrent control and shore protection works and structure for erosion and torrent control and shore protection

Abstract

A method of construction works for preventing the bedand shore of a torrent from being eroded by using steel cablesand steel nets without requiring a huge number of works or hugecosts, comprising the steps of fixing at least two longitudinalcables (1) directly or indirectly to lodgments (2), connectingthe longitudinal cables by at least two lateral cables (5) atproper intervals, and disposing at least two nets (3), thenumber of which corresponds to the number of lateral cables,so that the nets are arranged at proper intervals in thedirection from upstream to downstream of the torrent andmooring the nets by the longitudinal cables and the lateralcables or mooring cables that are connected to the longitudinalcables so that the nets face the water flow of the torrent.

CA2401992C, drawing sheet 1
Sheet 1 of 7

Term

Term ended

Expired 26 December 2021, 4.7 years ago.

  1. Priority
  2. Filed
  3. Granted
  4. Expired
  5. Today

13 claims: 6 independent, 7 dependent

  1. 1
    16 CLAIMS:1. A method for controlling a torrent and preventing a torrent bed from being eroded, comprising: fixing at least two longitudinal cables to at least one lodgment;connecting the longitudinal cables by at least two lateral cables at proper intervals;providing at least two nets, the number of nets corresponding to the number of lateral cables;and mooring the at least two nets by the longitudinal cables and the lateral cables such that (i) the nets are arranged at the proper intervals in a direction of a water flow of the torrent and (ii) each net is placed on the torrent bed so that meshes of the net engage with gravel on the torrent bed and gravel that comes down from upstream regions onto the net.
  2. 2
    The method of claim 1, wherein the at least one lodgment is one of a tree, rock, and artificial structure.
  3. 3
    The method of claim 1, wherein the longitudinal cables are fixed to two lodgments through an auxiliary cable.
  4. 4
    A method for controlling a torrent and preventing a torrent bed from being eroded, comprising:fixing at least two longitudinal cables to at least one lodgment;providing at least two nets;and mooring the nets by the longitudinal cables and mooring cables connected to the longitudinal cables so that 17 (i) the nets are arranged at the proper intervals in a direction of a water flow of the torrent and (ii) each net is placed on the torrent bed so that meshes of the net engage with gravel on the torrent bed and gravel that comes down from upstream regions onto the net.
  5. 5
    A structure for controlling a torrent and preventing a torrent bed from being eroded, comprising:at least one lodgment;at least two longitudinal cables connected to the at least one lodgment;at least one lateral cable connecting the longitudinal cables at proper intervals;and at least one net, the number of nets corresponding to the number of lateral cables, moored by the longitudinal cables and the lateral cable such that (i) the at least one net is arranged at proper intervals in a direction of a water flow of the torrent and (ii) that the at least one net is placed on the torrent bed so that meshes of the net engage with gravel on the torrent bed and gravel that comes down from upstream regions onto the net.
  6. 6
    The structure of claim 5, wherein the at least two longitudinal cables are directly connected to the at least one lodgment.
  7. 7
    The structure of claim 5, further comprising at least one fence member connected to the at least one net.
  8. 8
    The structure of claim 7, wherein the at least one fence member is a series of concrete blocks connected by elongated concertina wires filled with stones. 18
  9. 9
    A structure for controlling a torrent and preventing a torrent bed from being eroded, comprising:at least one lodgment;at least two longitudinal cables connected to the at least one lodgment;at least one net;and mooring cables for connecting the at least one net to the longitudinal cables so that (i) the at least one net is arranged at proper intervals in a direction of a water flow of the torrent and (ii) the at least one net is placed on the torrent bed so that meshes of the net engage with gravel on the torrent bed and gravel that comes down from upstream regions onto the net.
  10. 10
    A method for controlling a torrent and preventing a torrent bed and shore from erosion, comprising:fixing at least two longitudinal cables to at least one first lodgment;mooring at least two first nets by the longitudinal cables and mooring cables connected to the longitudinal cables so that (i) the first nets are arranged at proper intervals in the direction of a water flow of the torrent and (ii) each first net is placed on the torrent bed so that meshes of the net engage with gravel on the torrent bed and gravel that comes down from upstream regions onto the net;providing at least two stable second lodgments alongside the torrent;19 connecting at least two second nets at upper sides thereof to the second lodgments so that the second nets hang on a surface of the shore;and connecting the second nets at lower sides thereof to a third lodgment fixed to at least one of the shore, the torrent bed, and any one of the longitudinal cables.
  11. 11
    A structure for controlling a torrent and preventing a torrent bed and shore from being eroded, comprising:at least one first lodgment;at least two longitudinal cables connected to the at least one first lodgment;at least one first net moored by the longitudinal cables and mooring cables connected to the longitudinal cables so that (i) the at least one first net is arranged at proper intervals in the direction of a water flow of the torrent and (ii) the at least one first net is placed on the torrent bed so that meshes of the net engage with gravel on the torrent bed and gravel that comes down from upstream regions onto the net;at least two stable second lodgments provided alongside the torrent;at least one second net connected at upper sides thereof to the second lodgments so that the at least one second net hangs on a surface of the shore;and a third lodgment fixed to at least one of the shore, the torrent bed, and any one of the longitudinal cables for fixing a lower side of the at least one second net. 20
  12. 12
    The structure of claim 11, further comprising an auxiliary member moored between the second lodgments and the third lodgment, the auxiliary member being one of a sheet of cloth and a cover that is in the form of a bar blind.
  13. 13
    The structure of claim 11, wherein the first, second, and third lodgments are one of a tree, rock, and artificial structure.