US9853494B2

Active engine cool down time delay for automatic transfer switch controllers

Summary by NHIP

Generator Cool Down System

The system operates a generator until primary power is detected, then runs it unloaded for a calculated duration. The controller determines this time using a moving window average of load percentages and a lookup table based on worst-case load application times.

Claim Score by NHIP

Read claim 1, the broadest

Abstract

A system for providing backup power to a facility includes a generator and a controller. The controller is configured to operate the generator until a condition is met, determine a load history that occurs while operating the generator until the condition is met, determine a cool-down time based on the determined load history, and run the generator to the point when the condition is met and in an unloaded condition for the cool-down time.

US9853494B2, drawing sheet 1
Sheet 1 of 7

Term

9.2 yearsleft in the term

Expires 19 November 2035, including 702 days of term adjustment.

  1. Priority and filed
  2. Granted
  3. Today
  4. Expires

17 claims: 3 independent, 14 dependent

  1. 1
    Broadest claimClaim Score 68, broad(NHIP)A system for providing backup power to a facility, comprising:a generator;and a controller configured to: operate the generator until a condition is met;determine a load history that occurs while operating the generator until the condition is met;determine a cool-down time based on the load history that occurred during a moving window of time, wherein the moving window of time is defined as a fixed time period prior to when the condition is met, and wherein the cool-down time is based on an average power that occurred during the moving window of time;and run the generator to the point when the condition is met and in an unloaded condition for the cool-down time;wherein the load history determined includes a percentage of full load of the generator.
  2. 8
    A method for providing backup power to a facility, comprising:operating a generator until a primary power is restored to the facility;determining a load profile while operating the generator before the power was restored;determining a cool-down time based on the load profile that occurred during a moving window of time that is for a fixed time period prior to when the power was restored, and based on an average power that occurred during the moving window of time;determining the average power as a percentage load of the load profile by sensing an amount of load over a given time period that defines the moving window of time, and accounting for any change in load over the given time period;and running the generator to the point when the power is restored and in an unloaded condition for the cool-down time.
  3. 15
    A non-transitory computer-readable medium tangibly embodying computer-executable instructions to:operate a generator until a condition is met;determine a percentage of full load while operating the generator until the condition is met;determine a cool-down time based on the percentage of full load during a moving window of time that is for a fixed time period prior to when the condition is met;and run the generator past the point when the condition is met and in an unloaded condition for the cool-down time;and calculate the percentage load over various time increments during the given time period, calculate the percentage load for each time increment, determine an average over the fixed time period, and determine the determined percentage as the average.