US6690983B2

Numerical control data creating device and numerical control data creating method

Summary by NHIP

NC Data Creation Method

The method separates part data from board design to generate nozzle, recognition, and mount time datasets. It then arranges part cassettes and creates numerical control data to ensure uniform mount times across different machine types.

Claim Score by NHIP

Read claim 1, the broadest

Abstract

In NC data creating device and method, a data input portion separates part data of a part to be mounted and mount coordinate data indicating the mount position of the part from design information of a board input and stores the production time of the board input, a feeding means characteristic management portion creates and manages feeding means characteristic data indicating the relationship between the part and the part feeding means on the basis of the part data, a recognizing method management portion creates and manages recognizing method data indicating the relationship between the part and a method of recognizing the part on the basis of the part data, a mount time management portion creates and manages the mount time data indicating the mount time required for mounting onto the board every part type on the basis of the part data, and numerical control data creating means creates numerical control data on the basis of the data of each storage portion and each management portion.

US6690983B2, drawing sheet 1
Sheet 1 of 7

Term

Term ended

Expired 12 May 2020, 6.4 years ago.

  1. Priority
  2. Filed
  3. Granted
  4. Expired
  5. Today

2 claims: 1 independent, 1 dependent

  1. 1
    Broadest claimClaim Score 41, average(NHIP)A numerical control data creating method for creating numerical control data to control a part mounting machine for feeding a part and mounting the part onto a board, comprising:a step of separating part data of the part to be actually mounted from design information of the board, and mount coordinate data indicating a mount position of the part;a step of creating, on the basis of the part data, nozzle characteristic data indicating the relationship between the part and nozzle type, recognizing method data indicating the relationship between the part and a method for recognizing the part, and mount time data indicating the mount time required for the mounting onto the board every part type;a step of settling an arrangement of a part cassette allocated every part mounting machine type on the basis of mounting machine construction data to create part cassette arrangement data;and a step of creating numerical control data on the basis of the respective data so that the mount time of the part from the part cassette allocated every part mounting machine onto the board is uniform.