US3681484A

Method for surfacing poured material

Abstract

A method for surfacing poured concrete material to make a slab with less manual labor and more strength by vibrating a straight edge guided at the proper height and supported on the building structure. The apparatus comprises vibrating straight edge for surfacing low slump concrete mix with less manual effort.

US3681484A, drawing sheet 1
Sheet 1 of 8

Term

Term ended

Expired 1 August 1989, 37.1 years ago.

  1. Priority and filed
  2. Granted
  3. Expired
  4. Today

6 claims: 6 independent, 0 dependent

  1. 1
    What is claimed is:25 1. In a method for constructing a slab of synthetic material, such as concrete, at a predetermined elevation vertically spaced above a supporting surface, including the steps of: a. providing a plurality of laterally spaced support columns extending vertically upward from said supporting surface;b. supporting a material retaining floor form means between said vertically extending support columns adjacent said predetermined elevation above said supporting surface and below the ends of said columns;c. clamping laterally spaced guide rails onto said vertically extending support columns in substantially parallel relationship and at a predetermined vertically spaced elevation above said floor form means and independent of said form supporting means;d. pouring onto said floor form means an amount of workable synthetic material sufficient to construct said slab;e. supporting a straight edge means from said guide rails at a position over and adjacent said poured material;and, f. manipulating said straight edge means along said guide rails into contact with and against said poured material a sufficient amount to work the top surface of said poured material to a predetermined elevation.
  2. 2
    In a method for constructing a slab of synthetic material as described in claim 1 further including the step of, power vibrating said straight edge means while working the top surface of said poured material to said predetermined elevation.
  3. 3
    In a method for constructing a slab of synthetic 60 material as described in claim 1 further including the step of, adjusting the elevation of said spaced guide rails independent of said form support means.
  4. 4
    In a method for constructing a series of vertically 65 spaced slabs of synthetic material, such as concrete, with each of said slabs being located at a predetermined elevation above a supporting surface, including the steps of:3,681,484 a. providing a plurality of laterally spaced support columns extending vertically upward from said supporting surface;b. supporting a material retaining floor form means between said vertically extending support columns adjacent a first predetermined elevation above said supporting surface and below the ends of said columns;c. clamping laterally spaced guide rails onto said vertically extending support columns in substantially parallel relationship and at a predetermined vertically spaced distance above said floor form means and independent of said form supporting means;d. pouring onto said floor form means an amount of workable synthetic material sufficient to construct said slab;e. supporting a straight edge means from said guide rails at a position over and adjacent said poured material;f. manipulating said straight edge means along said guide rails into contact with and against said poured material a sufficient amount to work the top surface of said poured material to a first 8 predetermined elevation;g. extending said laterally spaced vertical support columns above said first predetermined elevation to a second predetermined elevation;h. supporting a material retaining floor form means between said extended vertical support columns adjacent said second predetermined elevation;i. repeating steps (c-f) until a second slab is constructed at said second predetermined elevation;and, j. repeating steps (g-i) until the desired number of vertically spaced slabs are constructed.
  5. 5
    In a method for constructing a series of slabs of synthetic material as described in claim 4 further including the step of power vibrating said straight edge means while working the top surface of said poured material to said series of predetermined elevations.
  6. 6
    In a method for constructing a series of slabs of synthetic material as described in claim 4 further including the step of, adjusting the elevation of said guide rails independent of said form support means at each of said predetermined elevations. *****