US20210103879A1

System and method for labor scheduling and jobsite management

Claim Score by NHIP

Read claim 19, the broadest

Abstract

A system for labor scheduling and jobsite management is disclosed that manages a dynamically changing workforce. The system includes a graphical user interface (GUI) and a processor circuit that controls the GUI. The system provides a plurality of user-selectable input screens that allow input of information regarding employee onboarding, flexible staffing and workflow management, time entry/payroll support, significant event reporting, and medical protocol management. The system receives user input from one or more of the user-selectable input screens and generates, and dynamically updates, a plurality of work schedules for a respective plurality of workers having different skills working on different aspects of a job at different times as the job progresses. The system further manages time keeping, payroll, benefits, and medical protocols for workers beginning and ending work at different times as the job progresses to thereby pay each worker at the completion of their assignment irrespective of other workers.

US20210103879A1, drawing sheet 1
Sheet 1 of 19

Term

Projected expiry 3 October 2039.

  1. Priority and filed
  2. Published
  3. Today
  4. Projected expiry

20 claims: 4 independent, 16 dependent

  1. 1
    A system for labor scheduling and jobsite management for a dynamically changing workforce, the system comprising:a graphical user interface (GUI);anda processor circuit that is configured to perform operations comprising: controlling the GUI to present a user interface that includes a plurality of user-selectable input screens that allow input of information regarding employee onboarding, flexible staffing and workflow management, time entry/payroll support, significant event reporting, and medical protocol management;receiving user input from one or more of the user-selectable input screens;generating and dynamically updating a plurality of work schedules for a respective plurality of workers having different skills working on different aspects of a job at different times as the job progresses;andmanaging time keeping, payroll, benefits, and medical protocols for workers beginning and ending work at different times as the job progresses.
  2. 7
    A processor-implemented method of labor scheduling and jobsite management for a dynamically changing workforce, the method comprising:controlling, by a processor-circuit, a GUI to present a user interface that includes a plurality of user-selectable input screens that allow input of information regarding employee onboarding, flexible staffing and workflow management, time entry/payroll support, significant event reporting, and medical protocol management;receiving user input from one or more of the user-selectable input screens;generating and dynamically updating a plurality of work schedules for a respective plurality of workers having different skills working on different aspects of a job at different times as the job progresses;andmanaging time keeping, payroll, benefits, and medical protocols for workers beginning and ending work at different times as the job progresses.
  3. 13
    A non-transitory computer readable storage device having computer program instructions stored thereon that, when executed by a processor circuit, cause the processor circuit to perform operations that implement a method of labor scheduling and jobsite management for a dynamically changing workforce, the operations comprising:controlling a GUI to present a user interface that includes a plurality of user-selectable input screens that allow input of information regarding employee onboarding, flexible staffing and workflow management, time entry/payroll support, significant event reporting, and medical protocol management;receiving user input from one or more of the user-selectable input screens;generating and dynamically updating a plurality of work schedules for a respective plurality of workers having different skills working on different aspects of a job at different times as the job progresses;andmanaging time keeping, payroll, benefits, and medical protocols for workers beginning and ending work at different times as the job progresses.
  4. 19
    Broadest claimClaim Score 45, average(NHIP)A non-transitory computer readable storage device having computer program instructions stored thereon that, when executed by a processor circuit, cause the processor circuit to perform operations that implement functionality that includes third-party time tracking, the operations comprising:generating a web-based GUI on a user device that is configured to perform operations including: receiving time entries from third-party contractors;tracking and managing costs for a given jobsite including tracking sub-contracted personnel, third-party equipment, site material costs, and labor costs based on third-party time entries;tracking separate costs incurred by a primary user versus costs incurred by third-party contractors;andgenerating and maintaining a single repository of information regarding all jobsite costs.