US20160326832A1

Fluid communication with an earth formation through cement

Claim Score by NHIP

Read claim 30, the broadest

Abstract

A well system can include a well tool with a retarder chemical. The retarder chemical is released from the well tool into an annulus and retards setting of cement therein. A method of retarding setting of cement at a location in an annulus can include releasing a retarder chemical from a well tool connected in a casing string, after the cement is placed in the annulus. A well tool can include a valve that controls fluid communication via a port between an exterior of the tool and a flow passage extending through the tool, an annular recess, and a dispersible annular exterior component received in the recess. Another well tool can include a valve that controls fluid communication between an exterior of the tool and a flow passage extending through the well tool, an internal chamber, and a retarder chemical in the chamber.

US20160326832A1, drawing sheet 1
Sheet 1 of 16

Term

8.7 yearsto projected expiry

Projected expiry 20 June 2035, counted from filing; an application has no term until it is granted.

  1. Priority
  2. Filed
  3. Published
  4. Today
  5. Projected expiry

17 claims: 12 independent, 5 dependent

  1. 2
    A well system, comprising:a well tool including a retarder chemical, and casing connectors at opposite ends of the well tool;and the retarder chemical is released from the well tool into an annulus surrounding the well tool and retards setting of a cement in the annulus, wherein the retarder chemical is released from an internal chamber of the well tool.
  2. 8
    A well system, comprising:a well tool including a retarder chemical, and casing connectors at opposite ends of the well tool;and the retarder chemical is released from the well tool into an annulus surrounding the well tool and retards setting of a cement in the annulus, wherein the retarder chemical is released in response to application of pressure to an interior of the well tool.
  3. 10
    A well system, comprising:a well tool including a retarder chemical, and casing connectors at opposite ends of the well tool;and the retarder chemical is released from the well tool into an annulus surrounding the well tool and retards setting of a cement in the annulus, wherein the well tool further comprises a valve that selectively prevents and permits fluid communication between the annulus and an interior flow passage that extends longitudinally through the well tool, wherein the retarder chemical is released in response to application of a first pressure to the interior flow passage, and wherein the valve is opened in response to application of a second pressure to the interior flow passage, and wherein the second pressure is greater than the first pressure.
  4. 11
    A well system, comprising:a well tool including a retarder chemical, and casing connectors at opposite ends of the well tool;and the retarder chemical is released from the well tool into an annulus surrounding the well tool and retards setting of a cement in the annulus, wherein the well tool further comprises a valve that selectively prevents and permits fluid communication between the annulus and an interior flow passage that extends longitudinally through the well tool, wherein the retarder chemical is released in response to application of a predetermined pressure to the interior flow passage, and wherein the valve is opened in response to placement of a plug in the interior flow passage and application of a predetermined pressure differential across the plug.
  5. 14
    A method of retarding setting of a cement at one or more discrete locations in a well annulus, the method comprising:releasing a retarder chemical from a well tool connected in a casing string, and the releasing step being performed after the cement is placed in the annulus, wherein the releasing step comprises releasing the retarder chemical from an internal chamber of the well tool.
  6. 15
    A method of retarding setting of a cement at one or more discrete locations in a well annulus, the method comprising:releasing a retarder chemical from a well tool connected in a casing string, and the releasing step being performed after the cement is placed in the annulus, wherein the releasing step comprises releasing the retarder chemical in response to application of pressure to the well tool.
  7. 30
    Broadest claimClaim Score 89, very broad(NHIP)A well tool, comprising:a valve that selectively prevents and permits fluid communication between an exterior of the well tool and an interior flow passage extending longitudinally through the well tool;an internal chamber;and a retarder chemical disposed in the internal chamber.