US20160183293A1

Scheduling enhancement in wireless communication

Claim Score by NHIP

Read claim 8, the broadest

Abstract

The subject matter described herein relates to scheduling enhancement in wireless communication. A scheduling grant including an indicator can be generated, for example, at the base station (BS). The indicator included in the scheduling grant identifies multiple carriers to be scheduled with the scheduling grant. Upon receiving the scheduling grant, a device, for example, UE can recognize the multiple carriers scheduled with the single scheduling grant, and can detect corresponding data transmission in the multiple carriers accordingly. Compared with scheduling each carrier with independent scheduling grant, the proposed solution saves control signaling overhead, and thereby alleviates the problems caused by control signaling capacity limitation, and increase peak data rate and system throughput.

US20160183293A1, drawing sheet 1
Sheet 1 of 5

Term

8.3 yearsto projected expiry

Projected expiry 8 January 2035, counted from filing; an application has no term until it is granted.

  1. Priority
  2. Filed
  3. Published
  4. Today
  5. Projected expiry

20 claims: 3 independent, 17 dependent

  1. 1
    A method of wireless communication, comprising:generating a scheduling grant including a first indicator, the first indicator indicating multiple carriers to be scheduled with the scheduling grant;transmitting the scheduling grant to user equipment;andtransmitting data to the user equipment on the multiple carriers.
  2. 8
    Broadest claimClaim Score 90, very broad(NHIP)A method of wireless communication, comprising:receiving a scheduling grant including a first indicator;determining multiple carriers scheduled with the scheduling grant based on the first indicator;anddetecting data transmission in the multiple carriers according to the scheduling grant.
  3. 15
    An apparatus for wireless communication, comprising:a scheduling grant generator configured to generate a scheduling grant including a first indicator which indicates multiple carriers to be scheduled with the scheduling grant and at least one common one common scheduling parameter to be applied to the multiple carriers;a first transmitter configured to transmit the scheduling grant to user equipment;anda second transmitter configured to transmit data to the user equipment on the multiple carriers.