US20030191681A1

Method for managing a business process related to a document publishing project

Claim Score by NHIP

Read claim 2, the broadest

Abstract

Management of the processes involved with document publishing involves identifying tasks associated with the processing of information that is to form the publication and assigning worker resources to such tasks. Time to complete the tasks are estimated and schedules are developed. Actual work time is measured. Reports are generated and a planning tool is provided.

US20030191681A1, drawing sheet 1
Sheet 1 of 21

Term

Term ended

Projected expiry passed 6 May 2023, 3.4 years ago.

  1. Priority and filed
  2. Published
  3. Projected expiry
  4. Today

15 claims: 6 independent, 9 dependent

  1. 1
    A method for managing a document publishing project, the method comprising:(a) receiving document publishing project information;and (b) identifying a plurality of work flows based on the information, each work flow comprising one or more tasks;(c) assigning the one or more tasks to one or more worker resources;(d) automatically receiving an indication of a processing issue associated with at least a portion of the information upon the worker resource identifying the processing issue;(e) automatically identifying an issue processing work flow based on the processing issue;(f) assigning to at least one of the worker resources at least a portion of the identified issue processing work flow;and (g) generating a report comprising issue processing resolution information.
  2. 2
    Broadest claimClaim Score 70, broad(NHIP)A method for managing a document publishing project, the method comprising:(a) receiving document publishing project information;and (b) upon receipt of the information, automatically identifying a plurality of work flows based on the information, each work flow comprising one or more tasks and each task associated with a capability for completing the task;and automatically identifying for each task a worker resource with the capability associated with the task;and (c) creating a schedule for the project comprising a task sequence and a resource allocation.
  3. 4
    A method for managing a plurality of document publishing projects, each project comprising a plurality of tasks, the method comprising:(a) assigning required worker resources and an estimated time frame to complete the tasks for each project;(b) generating a first report comprising a total of required worker resources and a total estimated time frame to complete all tasks for at least two of the projects;(c) changing at least one of the required worker resources and the estimated time frame;(d) determining an impact an ability to complete the projects resulting from the change;(d) generating a second report reflecting the impact.
  4. 5
    A method for managing a business process relating to one or more document publishing projects comprising:(a) receiving document publishing project information;(b) identifying a plurality of tasks for processing the information;(c) storing an indicator for each said task in a storage medium;(d) assigning to one or more worker resources at least one of the tasks, comprising associating an indicator for each said worker resource with the indicator for the assigned task and storing the association in the storage medium;(e) recording a work start time and a work end time, and indicating one or more work pause period of the worker resource for the assigned task;wherein the work start time is automatically indicated upon the worker resource commencing work for the assigned task and the work end time is automatically indicated upon the worker completing work for the assigned task;(f) upon the indication of the work start time, automatically commencing measurement of an elapsed time to complete task, wherein the elapsed time to complete task comprises a difference between the work start time and the work end time;(g) automatically calculating an execution time to complete task comprising a sum of worked time periods between the one or more work pause periods;and (h) storing the elapsed time to complete task and the execution time to complete task for the assigned task in the storage medium.
  5. 13
    A method for managing a business process relating document publishing project comprising:(a) receiving document publishing project information, wherein the project information is arranged in accordance with a hierarchical structure, wherein the structure comprises a plurality of structure elements including at least one submission level each of which comprises one or more folders levels, wherein the folder levels each comprise one or more content item levels;(b) maintaining in a storage medium at least one work flow, comprising one or more tasks, for the information associated with each of the structure elements;(c) identifying one or more of the tasks based on the information;and (d) assigning to one or more worker resources at least one of the tasks.
  6. 14
    A graphical user interface for use in connection with managing document publishing project comprising:a submission display area that displays document publishing project information arranged in accordance with a hierarchical structure, wherein the structure comprises a plurality of structure elements including at least one submission level, each of which comprises one or more folders levels, wherein the folder levels each comprise one or more content item levels;and a content item display area that displays content item information associated with one of the structure elements selected in the submission display area;wherein the content item display area allows an operator to view, for all content items in the selected structure element, task information associated with the project information.