US20030171981A1

Computer implemented vehicle repair analysis system

Claim Score by NHIP

Read claim 1, the broadest

Abstract

A computer-implemented method and apparatus is provided for tracking a vehicle during a vehicle-related multi-step process. A vehicle identifier is received for uniquely identifying a vehicle. A delay reason is received for why the vehicle was delayed during at least one of the multi-step processes. An association is stored among the delay reason, the step at which the vehicle delay occurred, and the vehicle identifier. The stored association is used to identify at least one delay reason for the vehicle. The method and apparatus also analyze business aspects of the vehicle-related multi-step process and succinctly summarize the business analysis with respect to performance, priorities, projections, and production workforce shift profiles.

US20030171981A1, drawing sheet 1
Sheet 1 of 13

Term

Term ended

Projected expiry passed 11 March 2023, 3.5 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

34 claims: 2 independent, 32 dependent

  1. 1
    Broadest claimClaim Score 79, broad(NHIP)A computer-implemented method for tracking a vehicle during a vehicle-related collision repair multi-step process, comprising the steps of:receiving a vehicle identifier for uniquely identifying a vehicle;receiving a delay reason for why the vehicle was delayed during at least one step of the multi-step collision repair process;storing an association among the delay reason, the step at which vehicle delay occurred, and the vehicle identifier;and using the stored association to identify at least one delay reason for the vehicle.
  2. 17
    A computer-implemented method for analyzing a vehicle-related business, comprising the steps of:storing a business performance data structure stored in memory of at least one computer in order to summarize business performance data related to the business;storing a business priorities performance data structure stored in the memory in order to summarize business priorities performance related to the business;storing a business projections data structure stored in the memory in order to summarize business projections data related to the business;storing a production workforce shift profile data structure in the memory in order to summarize product workforce shifts related to the business;and generating a business summary report using the business performance data structure, the business priorities performance data structure, the business projections data structure, and the production workforce shift profile data structure.