US10116239B2

Single phase motor energy economizer for regulating the use of electricity

Summary by NHIP

Single-phase motor energy economizer

The system reduces inrush loading by measuring source AC voltage and delaying load connection until the voltage enters an operating range. It employs a solid-state switch to connect the load, utilizing either a fixed or random time period, with optional remote control and induction motor soft-starting capabilities.

Claim Score by NHIP

Read claim 1, the broadest

Abstract

A system for reducing inrush loading when a source power is restored includes a device for switching power that selectively connects a load to the source of power and a circuit for measuring the AC voltage at the source and for determining when the AC voltage is within operating range. Responsive to the AC voltage being within operating range, the system delays for a time period then connects the load to the source of power by way of the device for switching power.

US10116239B2, drawing sheet 1
Sheet 1 of 30

Term

4.4 yearsleft in the term

Expires 7 March 2031.

  1. Priority and filed
  2. Granted
  3. Today
  4. Expires

16 claims: 3 independent, 13 dependent

  1. 1
    Broadest claimClaim Score 81, broad(NHIP)A system for reducing inrush loading when a source of electrical power is restored, the system comprising:means for switching the electrical power, the means for switching the electrical power selectively connecting a load to the source of the electrical power;means for measuring the AC voltage potential at the source of the electrical power;means for determining when the AC voltage potential is within an operating range;and responsive to the AC voltage potential being within the operating range, the system delays for a time period then connects the load to the source of the electrical power by way of the means for switching the electrical power.
  2. 8
    A method for reducing inrush loading when a source of electric power is restored, the method steps comprising in order:(a) disconnecting the load from the source of the electric power;(b) waiting until detecting operational power from the source of the electric power, then delaying for a period of time, the period of time being greater than a cycle time of the source of electric power;(c) after the delaying, connecting the load to the source of the electric power;(d) upon detecting a loss of power from the source of the electric power, repeating from step (a).
  3. 12
    A system for reducing inrush loading when a source of the electric power is restored, the system comprising:a processor;a tangible memory for storing instructions, the tangible memory interfaced to the processor;a solid-state switch, the solid-state switch in series between a load and the source of the electric power, the solid-state switch having a trigger that is controlled by the processor to selectively connect the load with the source of the electric power;means for measuring a voltage potential at the source of the electric power;a set of software instructions stored in the memory, the set of software instructions set the solid state switch to a high-impedance mode then determine when the voltage potential from the source of the electric power exceeds a pre-determined threshold, responsive to the voltage potential from the source of the electric power exceeding the pre-determined threshold, the software instructions delay for a period of time and after the delay, the software instructions set the solid state switch to a low-impedance mode, thereby connecting the load to the source of the electric power.