NO20101424L

Method for determining a set of net present values to influence the drilling of a wellbore and increase production

Abstract

A method is shown for modeling a first reservoir while drilling a wellbore into a corresponding second reservoir, wherein the first reservoir has multiple stations, comprising: determining multiple net present value values ​​corresponding to the multiple stations of the first reservoir, respectively. ; and drill the wellbore into the corresponding second reservoir in accordance with the multiple net present value values.

Term

No projected expiry on record.

  1. Priority
  2. Filed
  3. Published
  4. Today

29 members in 6 offices

This recordMember, by publication datePriority claim

Priority claims8

Priority claims
DocumentOfficeKindDate
14841508United States of AmericaA
14841508United States of AmericaA
2009039459United States of AmericaW
2009039459United States of AmericaW
12148415
PCTUS2009039459
US20080148415
WO2009US39459

Members29

Family members, oldest first
DocumentOfficeKind
US2009260880A1United States of AmericaA1
WO2009129060A1World Intellectual Property Organization (WIPO)A1
GB0922596D0United KingdomD0
US2010155142A1United States of AmericaA1
CA2690169A1CanadaA1
CA2793825A1CanadaA1
GB2467032AUnited KingdomA
NO20100086LNorwayL
US2010185427A1United States of AmericaA1
MX2010010988AMexicoA
NO20101424LThis recordNorwayL
GB201019338D0United KingdomD0
GB2472543AUnited KingdomA
US7966166B2United States of AmericaB2
WO2011091368A2World Intellectual Property Organization (WIPO)A2
WO2011091368A3World Intellectual Property Organization (WIPO)A3
GB2489638AUnited KingdomA
GB201217564D0United KingdomD0
GB2492011AUnited KingdomA
CA2690169CCanadaC
GB2472543BUnited KingdomB
GB2492011BUnited KingdomB
US8527248B2United States of AmericaB2
US8793111B2United States of AmericaB2
GB2489638BUnited KingdomB
NO20161926A1NorwayA1
NO340109B1NorwayB1
CA2793825CCanadaC
NO340861B1NorwayB1