IN3333DEN2014A

Preemptive setpoint pressure offset for flow diversion in drilling operations

Abstract

A method of controlling pressure in a well can include transmitting an instruction to change flow through an annulus formed radially between a drill string and a wellbore and adjusting a pressure setpoint in response to the transmitting. A well drilling system can include a flow control device which varies flow through a drill string and a control system which changes a pressure setpoint in response to an instruction for the flow control device to change the flow through the drill string. A method of controlling pressure in a well can include transmitting an instruction to divert flow from a drill string and adjusting a pressure setpoint in response to the transmitting.

IN3333DEN2014A, drawing sheet 1
Sheet 1 of 13

Term

No projected expiry on record.

  1. Priority and filed
  2. Published
  3. Today

4 claims: 3 independent, 1 dependent

  1. 1
    WHAT IS CLAIMED IS:1. A method of controlling pressure in a well, the method comprising: transmitting an instruction to change flow through an annulus formed radially between a drill string and a wellbore;and adjusting a pressure setpoint in response to the transmitting . The method of claim 1 , wherein the adjusting is performed prior to flow through the annulus changing. The method of claim 1 wherein the adjusting is performed while flow through the annulus changes. The method of claim 1 wherein the flow change is caused by diversion of flow from the drill string to a mud return line. The method of claim 1 wherein the transmitting comprises encoding information as a sequence of flow variations . The method of claim 1 wherein the transmitting comprises initiating a connection in the drill string. WO 2013/070193 PCT/US2011/059743 - 41 7 . The method of claim 1 , further comprising predicting a change in the flow based on measured well parameters . The method of claim 7 , further comprising predicting a downhole pressure change due to the predicted change in the flow. The method of claim 1 , wherein the adjusting is 10 performed prior to the flow change being detected by sensors . WO 2013/070193 PCT/US2011/059743 a flow control device which varies flow through a drill string;and a control system which changes a pressure setpoint in change the flow through the drill string. device diverts flow from a standpipe line to a mud return line . device diverts flow from the drill string. change . annulus at or near the earth's surface. WO 2013/070193 PCT/US2011/059743 17. A method of controlling pressure in a well, the method comprising: transmitting an instruction to divert flow from a drill string;and adjusting a pressure setpoint in response to the transmitting . 18. The method of claim 17, wherein the adjusting is performed prior to flow through the drill string being diverted. 19. The method of claim 17, wherein the adjusting is performed while flow through the drill string is diverted. 20. The method of claim 17, wherein the flow change is caused by diversion of flow from the drill string to a mud return line. 21. The method of claim 17, wherein the transmitting comprises encoding information as a sequence of flow diversions . 22. The method of claim 17, wherein the transmitting comprises initiating a connection in the drill string. 23. The method of claim 17, further comprising predicting a change in the flow based on measured well parameters . WO 2013/070193 PCT/US2011/059743 - 44 24. The method of claim 23, further comprising predicting a downhole pressure change due to the predicted change in the flow. 25. The method of claim 17, wherein the adjusting performed prior to the diverting being detected by sensors. WO 2013/070193 PCT/US2011/059743 !/ίί WO 2013/070193 PCT/US2011/059743
  2. 2
    2/11 WO 2013/070193 PCT/US2011/059743
  3. 3
    3/11 WO 2013/070193 PCT/US2011/059743
  4. 4
    4/11 140 / HYDRAULIC MODEL SETPOINT OUTPUT MUD RETURN CHOKE CONTROL 138 DRILL AHEAD