IL147518A

Method and device for selecting a communication path

Abstract

This record has no abstract on file.

Term

No projected expiry on record.

  1. Priority and filed
  2. Published
  3. Today

7 claims: 3 independent, 4 dependent

  1. 1
    147518/2 CLAIMS 1. In a communication network, a method of allocating a second path of communication for use as a protection path for a first communication path, wherein the allocation is made in accordance with a chosen risk level definition, which method comprises :(i) providing data corresponding to physical and geographical deployment of a plurality of communication path segments belonging to the communication network;(ii) selecting N number of risk levels based on predefined criteria;(iii) for each of said N number of risk levels, assigning said plurality of communication path segments to a plurality of SRGs, where an SRG is a Shared Risk Group of communication path segments selected by predefined criteria so that all communication path segments belonging to any specific SRG are at risk of being damaged by a single damage event, where the probability of occurrence of such an event is represented by the risk level assigned to the specific SRG;(iv) choosing a first path of communication comprising a first group of communication path segments selected from among said plurality of communication path segments belonging to the communication network;(v) defining a risk level R which represents the highest risk level to be prevented;and (vi) selecting a second group of communication path segments from among said plurality of communication segments belonging to said communication network to establish said second communication path, wherein said second group of communication segments satisfies the following conditions: 13 147518/2 one of the selected segments of said second group starts at the starting point of the first path of communication;one of the selected segments of said second group ends at the end point of the first path of communication;all communication path segments belonging to the second group comprise one continuous path starting at the starting point of the first path and ending at the end point of the first path;and there is no SRG to which the risk level R or lower was assigned, that contains both a communication path segment belonging to the first communication path and a communication path segment belonging to the second communication path.
  2. 4
    The method according to any one of the preceding claims, wherein said communication network is a member of a group comprising:an optical communication network, a datacom network, a synchronous network, and any combination thereof.
  3. 5
    The method according to any one of the preceding claims, wherein said communication network comprises an optical telecommunication network. 15 6. A device for allocating a second path of communication for use as a protection path for a first communication path, wherein the allocation is made in accordance with a chosen risk level definition, the device comprising:a database comprising data corresponding to physical and 20 geographical deployment of a plurality of communication path segments belonging to a communication network, wherein said communication path segments are assigned to a plurality of SRGs for each of N number of risk levels, so that all communication path segments belonging to any specific SRG are 25 at risk of being damaged by a single damage event, where the probability of occurrence of such an event is represented by the risk level assigned to the specific SRG;an input/output (I/O) unit operative to receive a required input risk level;and 30 a processor operatively associated with the database and the I/O unit and operative to select a second group of communication path segments from among said plurality of communication path segments to establish said second communication path, wherein said second group of communication 35 path segments satisfies the following conditions: 15 147518/2 10 15 one of the selected segments of said second group starts at the starting point of the first path of communication;one of the selected segments of said second group ends at the end point of the first path of communication;all communication path segments belonging to the second group comprise one continuous path starting at the starting point of the first path and ending at the end point of the first path;and there is no SRG to which the risk level R or lower was assigned, that contains both a communication path segment belonging to the first communication path and a communication path segment belonging to the second communication path.