Nova Patents
EP2917469A2

Multi-zone screened fracturing system

Abstract

This record has no abstract on file.

Term

Projected expiry 5 November 2033.

  1. Priority
  2. Filed
  3. Published
  4. Today
  5. Projected expiry

36 claims: 3 independent, 33 dependent

  1. 1
    Claims of equivalent WO 2014074485 A2 WHAT IS CLAIMED IS:1 . A multi-zone formation treatment assembly for a borehole, comprising: a tubular structure disposed in the borehole and defining a through- bore;a plurality of sections disposed on the tubular structure, each of the sections comprising: an isolation element disposed on the tubular structure and isolating a borehole annulus around the section from the other sections, a flow valve disposed on the tubular structure and selectively operable between opened and closed conditions permitting and preventing fluid communication between the through-bore and the borehole annulus, a screen disposed on the tubular structure and communicating with the borehole annulus, and a closure disposed on the tubular structure and at least preventing fluid communication from the through-bore to the screen;and a workstring defining an outlet and being manipulated in the tubular structure relative to each section in the same trip to: open the flow valve, position in the through-bore relative to the open flow valve, deliver the treatment from the outlet to the section through the open flow valve, and close the flow valve.
  2. 18
    A multi-zone formation treatment assembly for a borehole, comprising:a tubular structure disposed in the borehole and defining a through- bore;a plurality of sections disposed on the tubular structure, each of the sections comprising: means for isolating a borehole annulus of the section from the other sections, means for selectively permitting and preventing fluid communication from the through-bore to the borehole annulus through a first flow path, means for screening fluid communication from the borehole annulus to the through-bore through a second flow path, and means for at least preventing fluid communication from the through-bore to the borehole annulus through the second flow path;and a workstring positioning in the through-bore relative to each of the sections and having means for delivering the treatment to each of the sections in the same trip.
  3. 26
    A multi-zone formation treatment method for a borehole, the method comprising:isolating a borehole annulus of the borehole around an assembly into a plurality of isolated zones, the assembly in each isolated zone having a first port and a screen communicating a through-bore of the assembly with the borehole annulus;positioning a workstring in the through-bore of the assembly;and treating each of the isolated zones without sealing the workstring in the through-bore by: selectively opening the first port in the assembly at the isolated zone with the workstring, flowing the treatment down the workstring to the isolated zone through the opened first port, at least preventing fluid communication from the through- bore to the borehole annulus through the screen on the assembly at the isolated zone, and selectively closing the first port at the isolated zone with the workstring after treatment.