Nova Patents
EP2808482A2

External grip tubular running tool

Abstract

A method for running a tubular string in wellbore operations according to one or more aspects of the present disclosure includes providing a tubular running tool comprising gripping assembly rotationally connected to a carrier, the gripping assembly comprising a body and slips; connecting the carrier to a quill of a top drive of a drilling rig; positioning an end of a tubular for gripping with the slips; actuating the slips into gripping engagement with the tubular; and rotating the tubular with the slips in gripping engagement therewith.

EP2808482A2, drawing sheet 1
Sheet 1 of 5

Term

3.1 yearsto projected expiry

Projected expiry 22 October 2029, counted from filing; an application has no term until it is granted.

  1. Priority
  2. Filed
  3. Published
  4. Today
  5. Projected expiry

19 claims: 3 independent, 16 dependent

  1. 1
    A tubular running tool (10), comprising:a carrier (34) configured to be suspended within a drilling rig (2);and a gripping assembly (32) rotationally connected to the carrier;the gripping assembly configured to move to a first engaged position with respect to the carrier such that the gripping assembly grips a first tubular (7) at a first outer diameter (D2) thereof and transmits torque to the first tubular about an axis of the tubular running tool;and the gripping assembly configured to move to a second engaged position with respect to the carrier such that the gripping assembly grips a second tubular (7a) at a second outer diameter (D1) thereof substantially different from the first outer diameter and transmits torque to the second tubular about the axis of the tubular running tool.
  2. 10
    A method of running a string of tubulars (5) into a borehole (4), the method comprising:suspending a tubular running tool (10) within a drilling rig (2), the tubular running tool having a gripping assembly (32) rotationally connected to a carrier (34);moving the gripping assembly to a first engaged position with respect to the carrier, the gripping assembly configured to grip a first tubular (7) at a first outer diameter (D2) thereof at the first engaged position and transmit torque to the first tubular about an axis of the tubular running tool;and moving the gripping assembly to a second engaged position with respect to the carrier, the gripping assembly configured to grip a second tubular (7a) at a second outer diameter (D1) thereof substantially different from the first outer diameter at the second engaged position and transmit torque to the second tubular about the axis of the tubular running tool.
  3. 19
    A method to manufacture a tubular running tool (10), the method comprising:constructing a carrier (34) configured to be suspended within a drilling rig (2);rotationally connecting a gripping assembly (32) to the carrier;and constructing the gripping assembly configured to move between a first engaged position and a second engaged position with respect to the carrier;wherein, in the first engaged position, the gripping assembly is configured to grip a first tubular (7) at a first outer diameter (D2) thereof and transmit torque to the first tubular about an axis of the tubular running tool;and wherein, in the second engaged position, the gripping assembly is configured to grip a second tubular (7a) at a second outer diameter (D1) thereof substantially different from the first outer diameter and transmit torque to the second tubular about the axis of the tubular running tool.