Method for manufacturing a hot gas path component.
7 claims: 3 independent, 4 dependent
- 1A method for manufacturing a hot gas path component (200, 300) of a turbine (100), the method comprising the following steps:forming cooling channels (206, 308, 506) in a surface of a member (202, 302, 508) of said hot gas path component (200, 300, 500);further drilling cooling holes (518) in the member;then disposing a layer (208, 402, 502) on the surface (204, 304) of the member (202, 302) to enclose the cooling channels (206, 308), the layer (208, 402) being disposed on a portion of the member (202, 302) to be cooled;and bonding the layer (208, 402) to the surface (204, 304), wherein bonding comprises disposing a braze filler metal between the layer (208, 402) and the surface (204, 304) and heating the layer (208, 402), the member (202, 302) and the braze filler metal to a selected temperature.
- 4The method of any preceding claim, wherein forming cooling channels (206, 308) comprises machining or investment casting the cooling channels (206, 308) in the member (202, 302).
- 5The method of any preceding claim, wherein forming cooling channels comprises forming the channels using at least one of a water jet, a mill, a laser, and electric discharge machining.
Independent claims3
20 paragraphs in 4 sections, as filed
BACKGROUND OF THE INVENTION
0001The subject matter disclosed herein relates to turbomachinery. More particularly, the subject matter relates to cooling passages in hot gas path components of turbines.
0002In a turbine, a combustor converts the chemical energy of a fuel or an air-fuel mixture into thermal energy. The thermal energy is conveyed by a fluid, often compressed air from a compressor, to a turbine where the thermal energy is converted to mechanical energy. As part of the conversion process, hot gas is flowed over and through portions of the turbine. High temperatures along the hot gas path can heat turbine components, causing degradation of components. Forming cooling channels in the components by casting may limit the proximity of the channels to the surface of the component to be cooled. Accordingly, the effectiveness of cooling channels is limited, thereby increasing thermal stress experienced by turbine components along the hot gas path.
0003<patcit id="pcit0001" dnum="US2008298975A1"><text>US 2008/298975 A1</text></patcit> discloses a method of manufacturing a hot gas path component of a turbine which includes the provision of cooling channels and auxiliary cooling passages.
BRIEF DESCRIPTION OF THE INVENTION
0004According to the invention, the method for manufacturing a hot gas path component of a turbine according to claim 1 is provided.
0005These and other advantages and features will become more apparent from the following description taken in conjunction with the drawings.
BRIEF DESCRIPTION OF THE DRAWING
0006The foregoing and other features, and advantages of the invention are apparent from the following detailed description taken in conjunction with the accompanying drawings in which: <ul id="ul0001" list-style="none"><li><figref idref="f0001">FIG. 1</figref> is a schematic diagram of an embodiment of a turbomachine system;</li><li><figref idref="f0002">FIG. 2</figref> is a schematic side view of an exemplary hot gas path component to be placed in a gas turbine;</li><li><figref idref="f0003">FIG. 3</figref> is a perspective view of an embodiment of a hot gas path component to be placed in a gas turbine;</li><li><figref idref="f0004">FIG. 4</figref> is another perspective view of the hot gas path component to be placed in a gas turbine; and</li><li><figref idref="f0005">FIG. 5</figref> is yet another schematic side view of an exemplary hot gas path component to be placed in a gas turbine.</li></ul>
0007The detailed description explains embodiments of the invention, together with advantages and features, by way of example with reference to the drawings.
DETAILED DESCRIPTION OF THE INVENTION
0008<figref idref="f0001">FIG. 1</figref> is a schematic diagram of an embodiment of a turbomachine system, such as a gas turbine system 100. The system 100 includes a compressor 102, a combustor 104, a turbine 106, a shaft 108 and a fuel nozzle 110. In an embodiment, the system 100 may include a plurality of compressors 102, combustors 104, turbines 106, shafts 108 and fuel nozzles 110. The compressor 102 and turbine 106 are coupled by the shaft 108. The shaft 108 may be a single shaft or a plurality of shaft segments coupled together to form shaft 108.
0009In an aspect, the combustor 104 uses liquid and/or gas fuel, such as natural gas or a hydrogen rich synthetic gas, to run the engine. For example, fuel nozzles 110 are in fluid communication with an air supply and a fuel supply 112. The fuel nozzles 110 create an air-fuel mixture, and discharge the air-fuel mixture into the combustor 104, thereby causing a combustion that creates a hot pressurized exhaust gas. The combustor 100 directs the hot pressurized gas through a transition piece into a turbine nozzle (or "stage one nozzle"), and other stages of buckets and nozzles causing turbine 106 rotation. The rotation of turbine 106 causes the shaft 108 to rotate, thereby compressing the air as it flows into the compressor 102. In an embodiment, hot gas path components, including, but not limited to, shrouds, diaphragms, nozzles, buckets and transition pieces are located in the turbine 106, where hot gas flow across the components causes creep, oxidation, wear and thermal fatigue of turbine parts. Controlling the temperature of the hot gas path components can reduce distress modes in the components. The efficiency of the gas turbine increases with an increase in firing temperature in the turbine system 100. As the firing temperature increases, the hot gas path components need to be properly cooled to meet service life. Components with improved arrangements for cooling of regions proximate to the hot gas path and methods for making such components are discussed in detail below with reference to <figref idref="f0002 f0003 f0004 f0005">FIGS. 2-5</figref>. Although the following discussion primarily focuses on gas turbines, the concepts discussed are not limited to gas turbines.
0010<figref idref="f0002">FIG. 2</figref> is a schematic side view of an exemplary hot gas path component 200. The hot gas path component 200 has an arrangement that improves cooling along the hot gas path, wherein a brazing or other suitable process is used to form the hot gas path component 200. The hot gas path component 200 includes a member 202 with a surface 204, wherein one or more channels 206 are formed in the surface 204. The hot gas path component 200 also includes a layer 208 with a filler material 210 disposed between the layer 208 and the member 202. During an assembly process, the parts of the hot gas path component 200 are held together by a clamping device 212. An exemplary manufacturing process for the hot gas path component 200 includes the following steps. Channels 206 are formed in the member 202 by a suitable method, such as milling. The filler material 210 is then placed on the surface 204 of the member 202. The layer 208 is placed on the filler material 210 and the surface 204, thereby enclosing channels 206. In one embodiment, the clamping devices 212 are configured to compress and hold the layer 208 and member 202 together during a heating cycle, such as those used in a brazing process.
0011Thus, when assembled, a brazing process heats the member 202, filler material 210 and layer 208 to a selected temperature for a selected amount of time, wherein the selected temperature is above a melting point of the filler material 210 and below a melting point of the member 202 and the layer 208. Exemplary heating cycles for brazing include heating the hot gas path component to a temperature between about 1255 and about 1464 K (1800 and about 2175 degrees Fahrenheit) for about 10 minutes. In some embodiments, the heating cycle is to greater than about 1436 K (2125 degrees Fahrenheit). The heating process melts the exemplary filler material 404, which may include a compound comprising boron, silicon and nickel (e.g., BNi-2, BNi-3, BNi-5). Exemplary materials for the member 202 and the layer 208 include alloys, such as nickel and cobalt base superalloys. After the heating cycle, the hot gas path component 200 is then cooled, thereby forming a bond between the member 202 and the layer 208 via the hardened filler material 210. The clamping devices 212 are optionally used to prevent decoupling (or "potato chipping") of portions of the hot gas path component 200 during the heating and cooling cycles.
0012After assembly and the brazing process, the hot gas path component 200 is configured to direct a cooling fluid through channels 206 to cool the hot gas path component 200 as hot gas passes along region 214 during turbine operation. By brazing the layer 208, a relatively small distance 216 is provided between the cooling channel 206 and the region 214 to be cooled. In an embodiment, the filler material 210 is a foil layer or a paste applied to the surface 210, wherein the filler material 210 provides a bond as it is heated and cooled. In embodiments, the member 202, the surface 204 and the layer 208 are curved, thereby enabling a cooling of a curved surface of the exemplary hot gas path component 200. Other shapes or surfaces are also contemplated, such as twisted or wavy surfaces. Exemplary curved hot gas path components 200 include a bucket, a nozzle or other curved member along a hot gas path of a turbine. The depicted arrangement and method for making the hot gas path component 200 provides improved cooling for the component, thereby reducing creep, oxidation and thermal fatigue while improving performance of the turbine.
0013<figref idref="f0003">FIG. 3</figref> is a perspective view of an embodiment of a hot gas path component to be placed in the gas turbine 100. As depicted, the exemplary hot gas path component is an embodiment of a stage one shroud 300. The shroud 300 includes a member 302 with a surface 304 proximate to a hot gas path in the turbine 100. The shroud 300 also includes a surface 306 proximate to cool fluid and/or air in the turbine 100. To improve cooling of the member 302, one or more channels 308 are formed in the surface 304, wherein the channels 308 are configured to cool the surface 304 by flowing a cooling fluid. The cooling fluid flows through holes 310 to channels 308. A fluid supply 312, such as a chamber and/or a pump, provides the cooling fluid, which may include air, a water solution and/or a gas. The shroud 300 is configured to interface with a similar adjacent shroud via a seal to be placed in a seal slot 314 in interface surface 316. In an embodiment, the seal and joined interface surface 316 reduces leakage of cool air from the surface 306 into the hot gas path, thereby providing high temperature hot gas to convert from thermal energy to mechanical energy inside the turbine 100. As will be described in detail with reference to <figref idref="f0004">FIG. 4</figref>, the channels 308 are covered by a layer to form a substantially flush surface 304 and enclose the channels 308.
0014As depicted, the channels 308 are configured to control a temperature of surface 304. The cooling fluid flows from fluid supply 312 through holes 310 into channels 308, wherein the proximity and configuration of channels 308 in relation to surface 304 provides improved cooling of the shroud 300. In embodiments, the cooling channels 308 are formed in turbine components proximate a hot gas flow path. Exemplary turbine components along the hot gas path include, but are not limited to, shrouds, nozzles, buckets and diaphragms. For example, the channels 308 are formed in a surface of sidewall of a nozzle assembly, wherein the channels are configured to cool the sidewall to reduce thermal fatigue for the nozzle assembly. The channels 308 may be formed in the member 302 by any suitable method, such as by investment casting during formation of the member 302. Another exemplary technique to form the channels 308 includes removing material from the member 302 after it has been formed. Removal of material to form channels 308 may include any suitable method, such as by using a water jet, a mill, a laser, electric discharge machining, any combination thereof or other suitable machining or etching process. As depicted, the cooling channels 308 are in a U configuration (when line of sight is perpendicular to the surface 304), however, the channels 308 may be formed in any suitable configuration for cooling including an S, O, Z or other suitable configuration. By using a material removal process, complex and intricate patterns may be used to form the channels 308 based on component geometry and other application specific factors, thereby improving cooling abilities for the hot gas path component. In addition, any number of channels 308 may be formed in the member 302, depending on desired cooling performances and other system constraints.
0015In embodiments, the cooling fluid is any suitable fluid that cools the turbine components and selected regions of gas flow, such as high temperature and pressure regions of the shroud 300. For example, the cooling fluid supply 312 is a supply of compressed air from the compressor 102, wherein the compressed air is diverted from the air supply routed to the combustor. Thus, the supply of compressed air bypasses the combustor 104 and is used to cool the shroud 300. Accordingly, the improved arrangement of channels 308 reduces the amount of compressed air used for cooling by improving cooling of the turbine components and regions near the components. As a result, an increased amount of compressed air is directed to the combustor 106 for conversion to mechanical output to improve overall performance and efficiency of the turbine 100 while extending turbine component life by reducing thermal fatigue. Further, the disclosed arrangement of the shroud 300 and channels 308 provides a more uniform temperature distribution along surface 304. In aspects, turbine components or parts, including the shroud 300, are formed of stainless steel or an alloy, where the parts may experience creep, oxidation and thermal fatigue if not properly cooled during engine operation.
0016<figref idref="f0004">FIG. 4</figref> is another perspective view of the shroud 300. As depicted, the shroud 300 includes a layer 402 (also referred to as "skin layer" "cover member" or "cover piece") disposed on the channels 308 in surface 304, thereby enclosing the channels 308. In an embodiment, the layer 402 is coupled to the surface 304 after channels 308 are formed in the member 302. Thus, the enclosed channels 308 provide improved cooling and reduced thermal fatigue for the shroud 300. In the depicted embodiment, the layer 402 is a suitable configuration, such as the exemplary U shaped member. The layer 402 may be formed from the same or different material as the shroud 300. Exemplary materials for the layer 402 include alloys, such as nickel or cobalt base superalloys. Further, the layer 402 may be any suitable geometry or configuration to cover and enclose the channels 308. The layer 402 may also comprise one or more members configured to enclose and/or cover the channels 308. The layer 402 is coupled to the surface 304 and member 302 via a suitable bonding method, such as brazing, linear friction welding and diffusion bonding. For example, the layer 402 is brazed to surface 304 by disposing a braze foil filler material 404 between the layer and surface 304. The filler material 404, member 302 and layer 402 are then heated to a selected temperature, wherein the filler material 404 is melted. The filler material 404, member 302 and layer 300 are then cooled to bond the layer 402 and member 302. The heating and cooling processes may be repeated to provide a heating cycle at selected temperatures to bond the parts. The brazing process heats the parts to a melting temperature for the filler material 404, wherein the temperature is below a melting point of the layer 402 and member 302.
0017With continued reference to <figref idref="f0004">FIG. 4</figref>, the illustrated layer 300 has a thickness 400 of less than about 1.5mm to provide cooling channels 308 that are less than about 1.5mm from the surface 304. In embodiments, the thickness 400 is less than about 1.2mm. In other embodiments, the thickness 400 is less than about 2.5mm. In embodiments, the thickness 400 is less than about .8mm. In yet other embodiments, the thickness 400 ranges from about .4mm to about .6mm. By providing the relatively thin layer 300 to cover and encapsulate the channels 308, the improved cooling of the shroud 300 extends the life of the hot gas path component. In one embodiment, the layer 402 is formed to fit the opening for channels 308 in member 302, wherein the layer 402 does not have to have a protruding portion removed. Thus, the layer 402 is disposed on and coupled to the surface 304 via brazing or another suitable method, as described above, and provides a substantially uniform profile with surface 304.
0018<figref idref="f0005">FIG. 5</figref> is a schematic side view of another exemplary hot gas path component 500. The hot gas path component 500 includes a layer 502 with a surface 504, wherein a filler material 510 is placed between the surface 504 and a member 508. Channels 506 are formed in a surface 507 of the member 508. In an embodiment, the member 508 is less than about 2.5mm thick. During an assembly process, the parts of the hot gas path component 500 are held together by a clamping device 512. An exemplary brazing process for the hot gas path component 500 includes the following steps. Channels 506 are formed in the member 508 by a suitable method, such as milling. Further, cooling holes 518 are formed by a suitable method, such as drilling. The filler material 510 is then placed on the surface 507 of the member 508. The filler material 510 is placed on the surface 504 and the member 508 is then placed on the layer 502, thereby enclosing channels 506. The layer 502, filler material 510 and member 508 are heated to a selected temperature for a selected amount of time, wherein the selected temperature is above a melting point of the filler material 510 and below a melting point of the layer 502 and the member 508. After the heating cycle, the hot gas path component 500 is then cooled, thereby forming a bond between the layer 502 and the member 508 via the hardened filler material 510. In an embodiment, the channels 506 have a relatively small distance 516 to a hot gas path region 514 in the turbine system, thereby improving cooling and reducing creep, oxidation and thermal fatigue for the hot gas path component 500 through improved cooling efficiency.
0019After completion of the brazing process, the component surfaces can be drilled for cooling holes and also coated using a thermal spray process or other coating processes. Hot gas path components in gas turbines are sometimes coated with McrAlY (metallic) bond coats and/or thermal barrier coating (ceramic) top coats. Cooling holes are also drilled in the hot gas path components to provide film cooling fluid/air to cool the part and the coating. In embodiments, after service of the turbine system, the parts are inspected, repaired if necessary and put back in service. Repair typically involves stripping the coating, inspection, welding or brazing to repair the defects such as cracks or loss of material. The parts are then coated and heat treated. Reopening and/or machining of cooling holes on repaired components can be a difficult and tedious process. In the embodiment shown in <figref idref="f0005">FIG. 5</figref>, the member 508 has the cooling holes 518 and coating, the member 508 can be drilled and/or coated prior to brazing it to the component 500, thereby simplifying the repair process. In an embodiment, a service run component can be modified to remove local thermally damaged regions or "hot spots." Cooling channels can be machined while the component is not assembled and the member 508 can be brazed/bonded to form the shroud 500 or other hot gas path component. The member 508 can be drilled for cooling holes and also coated with metallic and ceramic coatings prior to brazing/bonding to the component. It should be noted that this arrangement and method may be used during a manufacturing or repair process for the component 500.
0020While the invention has been described in detail in connection with only a limited number of embodiments, it should be readily understood that the invention is not limited to such disclosed embodiments. Accordingly, the invention is not to be seen as limited by the foregoing description, but is only limited by the scope of the appended claims.
Contents4
5 sheets
Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5
Every citation, both ways
| Document | Relation | Office | Cited during |
|---|---|---|---|
| US2010300115A1 | Cites | United States of America | Examiner |
| JP2010194578A | Cites | Japan | – |
| US2008298975A1 | Cites | United States of America | – |
| US2010300115A1 | Cites | United States of America | – |
9 members in 4 offices; this record represents the family
Priority claims4
| Document | Office | Kind | Date |
|---|---|---|---|
| 201113042167 | United States of America | A | |
| 201113042167 | United States of America | – | |
| US201113042167 | – | – | – |
| 201113042167 | – | – | – |
Members9
| Document | Office | Kind | |
|---|---|---|---|
| EP2497906A2 | European Patent Office (EPO) | A2 | |
| CN102678198A | China | A | |
| JP2012184763A | Japan | A | |
| US2013139510A1 | United States of America | A1 | |
| US8870523B2 | United States of America | B2 | |
| CN102678198B | China | B | |
| CN105649688A | China | A | |
| EP2497906A3 | European Patent Office (EPO) | A3 | |
| EP2497906B1This record | European Patent Office (EPO) | B1 |
83 legal events, as 9 offices reported them to INPADOC
Over the term
Point at a mark for the eventEvents
| Event | Code | Office | |
|---|---|---|---|
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977)REGISTERED BETWEEN 20240222 AND 20240228732E | 732E | GB | |
| Change of applicant/patenteeR081 | R081 | DE | |
| Opt-out of the competence of the unified patent court (upc) registeredP01 | P01 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed because of non-payment of the annual feeLapsedMM | MM | BE | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Patent ceasedCeasedPL | PL | CH | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| No opposition filedOpposition26N | 26N | EP | |
| No opposition filed within time limitOppositionORIGINAL CODE: 0009261PLBE | PLBE | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: NO OPPOSITION FILED WITHIN TIME LIMITSTAA | STAA | EP | |
| No opposition filed against granted patent, or epo opposition proceedings concluded without decisionGrantedR097 | R097 | DE | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Patent invalid in the netherlands as no translation has been filedMP | MP | NL | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Deletion acc. to par. 5 (withdrawal of the translation of the ep patent)MK05 | MK05 | AT | |
| Invalidation of extension of european patentsMG9D | MG9D | LT | |
| European patents granted designating irelandGrantedFG4D | FG4D | IE | |
| Dpma publication of mentioned ep patent grantGrantedR096 | R096 | DE | |
| Reference to at number (ep patent validated in austria)REF | REF | AT | |
| European patent takes effect as a national patent in ch/liEP | EP | CH | |
| Designated contracting statesAK | AK | EP | |
| European patent grantedGrantedFG4D | FG4D | GB | |
| (expected) grantORIGINAL CODE: 0009210GRAA | GRAA | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: THE PATENT HAS BEEN GRANTEDSTAA | STAA | EP | |
| Grant fee paidORIGINAL CODE: EPIDOSNIGR3GRAS | GRAS | EP | |
| Intention to grant announcedINTG | INTG | EP | |
| Intention to grant announced (deleted)INTC | INTC | EP | |
| Despatch of communication of intention to grant a patentORIGINAL CODE: EPIDOSNIGR1GRAP | GRAP | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: GRANT OF PATENT IS INTENDEDSTAA | STAA | EP | |
| Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deletedORIGINAL CODE: EPIDOSDIGR1GRAJ | GRAJ | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: EXAMINATION IS IN PROGRESSSTAA | STAA | EP | |
| Intention to grant announcedINTG | INTG | EP | |
| Despatch of communication of intention to grant a patentORIGINAL CODE: EPIDOSNIGR1GRAP | GRAP | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: GRANT OF PATENT IS INTENDEDSTAA | STAA | EP | |
| First examination report despatched17Q | 17Q | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: EXAMINATION IS IN PROGRESSSTAA | STAA | EP | |
| Request for examination filed17P | 17P | EP | |
| Designated contracting states (corrected)RBV | RBV | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: REQUEST FOR EXAMINATION WAS MADESTAA | STAA | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Search report despatchedORIGINAL CODE: 0009013PUAL | PUAL | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Public reference made under article 153(3) epc to a published international application that has entered the european phaseORIGINAL CODE: 0009012PUAI | PUAI | EP |
Numbers
- Publication
- 2497906
- Publication, DOCDB
- 2497906
- Publication, EPODOC
- EP2497906
- Application
- 12158311
- Application, DOCDB
- 12158311
- Application, EPODOC
- EP20120158311
Titles3
- German
- Verfahren zur Herstellung einer mit Heißgas beaufschlagten Komponente.
- English
- Method for manufacturing a hot gas path component.
- French
- Procédé de fabrication de composant de voie de gaz chauds d'une turbine.
Classification
- CPC, 10
- F01D25/12
- F02C7/00
- F01D5/18
- F01D25/14
- F01D9/04
- F05D2230/237
- F05D2240/11
- F05D2260/20
- Y10T29/49323
- B23K31/02
- IPC, 3
- F01D9 04
- B23K31 02
- F02C7 00
Designated states38
- Contracting states, 38
- Albania
- Austria
- Belgium
- Bulgaria
- Switzerland
- Cyprus
- Czechia
- Germany
- Denmark
- Estonia
- Spain
- Finland
- France
- United Kingdom
- Greece
- Croatia
- Hungary
- Ireland
- Iceland
- Italy
- Liechtenstein
- Lithuania
- Luxembourg
- Latvia
and 14 moreShow fewer
- Monaco
- North Macedonia
- Malta
- Netherlands (Kingdom of the)
- Norway
- Poland
- Portugal
- Romania
- Serbia
- Sweden
- Slovenia
- Slovakia
- San Marino
- Türkiye