Electricity storage control device for hybrid vehicle
Abstract
An electricity storage control device for a hybrid vehicle that includes: an internal combustion engine; a battery that is charged by a power generator driven by the internal combustion engine; and a motor that is driven upon receiving an electric power from the battery, the hybrid vehicle conducting travel in an EV mode for traveling with only the motor, includes: a planned traveling distance setting unit that sets a planned traveling distance in the EV mode; and a residual control unit that calculates a traveling enable distance in the EV mode according to an electricity storage state of the battery and that, when the planned traveling distance is longer than the traveling enable distance, operates the internal combustion engine to cause the power generator to charge the battery so that amount of storage in the battery reaches amount of storage corresponding to the planned traveling distance.

Term
4.7 yearsto projected expiry
Projected expiry 1 June 2031, counted from filing; an application has no term until it is granted.
- Priority
- Filed
- Published
- Today
- Projected expiry
1 sheet
Sheet 1
Every citation, both ways
| Document | Relation | Office | Cited during |
|---|---|---|---|
| EP1275936A2 | Cites | European Patent Office (EPO) | Search report |
| EP1707430A1 | Cites | European Patent Office (EPO) | Search report |
| WO2009059407A1 | Cites | World Intellectual Property Organization (WIPO) | Search report |
| JP2009248822A | Cites | Japan | Search report |
| EP2083156A1 | Cites | European Patent Office (EPO) | Search report |
4 priority claims, no other members on record
Priority claims4
| Document | Office | Kind | Date |
|---|---|---|---|
| 2010127846 | Japan | A | |
| 2010127846 | Japan | – | |
| 2010127846 | – | – | – |
| JP20100127846 | – | – | – |
76 legal events, as 10 offices reported them to INPADOC
Over the term
Point at a mark for the eventEvents
| Event | Code | Office | |
|---|---|---|---|
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal feeWithdrawnR119 | R119 | DE | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Patent lapsedLapsedMM4A | MM4A | IE | |
| Lapsed because of non-payment of the annual feeLapsedMM | MM | BE | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Gb: european patent ceased through non-payment of renewal feeCeasedGBPC | GBPC | EP | |
| Patent ceasedCeasedPL | PL | CH | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| No opposition filedOpposition26N | 26N | EP | |
| No opposition filed within time limitOppositionORIGINAL CODE: 0009261PLBE | PLBE | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: NO OPPOSITION FILED WITHIN TIME LIMITSTAA | STAA | EP | |
| No opposition filed against granted patent, or epo opposition proceedings concluded without decisionGrantedR097 | R097 | DE | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Fee paymentPLFP | PLFP | FR | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Deletion acc. to par. 5 (withdrawal of the translation of the ep patent)MK05 | MK05 | AT | |
| Invalidated european patentMG4D | MG4D | LT | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Patent invalid in the netherlands as no translation has been filedMP | MP | NL | |
| Dpma publication of mentioned ep patent grantGrantedR096 | R096 | DE | |
| Reference to at number (ep patent validated in austria)REF | REF | AT | |
| European patents granted designating irelandGrantedFG4D | FG4D | IE | |
| European patent takes effect as a national patent in ch/liEP | EP | CH | |
| Designated contracting statesAK | AK | EP | |
| European patent grantedGrantedFG4D | FG4D | GB | |
| (expected) grantORIGINAL CODE: 0009210GRAA | GRAA | EP | |
| Grant fee paidORIGINAL CODE: EPIDOSNIGR3GRAS | GRAS | EP | |
| Intention to grant announcedINTG | INTG | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Despatch of communication of intention to grant a patentORIGINAL CODE: EPIDOSNIGR1GRAP | GRAP | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Information provided on ipc code assigned before grantRIC1 | RIC1 | EP | |
| Search report despatchedORIGINAL CODE: 0009013PUAL | PUAL | EP | |
| Request for examination filed17P | 17P | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Public reference made under article 153(3) epc to a published international application that has entered the european phaseORIGINAL CODE: 0009012PUAI | PUAI | EP |
Numbers
- Publication
- 2394839
- Publication, DOCDB
- 2394839
- Publication, EPODOC
- EP2394839
- Application
- 111685194
- Application, DOCDB
- 11168519
- Application, EPODOC
- EP20110168519
Titles3
- German
- Stromspeichersteuervorrichtung für Hybridfahrzeuge
- English
- Electricity storage control device for hybrid vehicle
- French
- Dispositif de contrôle de stockage d'électricité pour véhicule hybride
Classification
- CPC, 15
- B60L58/12
- B60L15/2045
- B60L50/16
- B60L50/61
- B60L2240/622
- B60L2250/16
- B60L2260/26
- B60L2260/52
- B60L2270/142
- Y02T10/62
- Y02T10/64
- Y02T10/70
- Y02T10/7072
- Y02T10/72
- Y02T90/16
- IPC, 5
- B60L11 18
- B60L15 20
- B60L50 15
- B60L50 16
- B60L11 12
Designated states40
- Contracting states, 38
- Albania
- Austria
- Belgium
- Bulgaria
- Switzerland
- Cyprus
- Czechia
- Germany
- Denmark
- Estonia
- Spain
- Finland
- France
- United Kingdom
- Greece
- Croatia
- Hungary
- Ireland
- Iceland
- Italy
- Liechtenstein
- Lithuania
- Luxembourg
- Latvia
and 14 moreShow fewer
- Monaco
- North Macedonia
- Malta
- Netherlands (Kingdom of the)
- Norway
- Poland
- Portugal
- Romania
- Serbia
- Sweden
- Slovenia
- Slovakia
- San Marino
- Türkiye
- Extension states, 2
- Bosnia and Herzegovina
- Montenegro