- 1A user interface method for simulating traffic load on a telecommunication system comprising the steps of:sub-dividing the traffic load into traffic load sub-groups having common characteristics;generating for each traffic load sub-group a timeline display showing ramp up and decline rates as well as steady state volume as a function of time-of-day during a test period based on the common characteristics, wherein the ramp up rate corresponds to the rate at which calls are added to the system and the decline rate corresponds to the rate at which calls are disconnected from the system;and manipulating the timeline displays to change the ramp up and decline rates, the steady state volume, and the time-of-day along the timeline displays to simulate realistic traffic loading of the telecommunication system.
- 2The user interface method as recited in claim1 further comprising the step of generating from the traffic load sub-group timeline displays a traffic load timeline display that is a combination of at least two of the traffic load sub-group timeline displays.
- 5The user interface method as recited in any of claims 1 to 3 wherein each timeline display comprises a two-dimensional timeline display with volume of calls along a first axis and time-of-day along a second axis having a ramp up region, a steady state volume region and a decline region for the represented traffic load sub-group.
- 6A user interface display adapted for a traffic load simulator adapted to simulate traffic load on a telecommunication system, the user interface display comprising a plurality of timeline displays, one for each of a corresponding plurality of sub-groups into which the traffic load is divided, each sub-group having a common characteristic and each timeline display having a ramp up region, a steady state volume region and a decline region for the represented sub-group, the timeline display being adapted to show ramp up and decline rates as well as steady state volume as a function of time-of-day during a test period based on the common characteristics, wherein the ramp up rate corresponds to the rate at which calls are added to the system and the decline rate corresponds to the rate at which calls are disconnected from the system and wherein the timeline displays are manipulable to change the ramp up and decline rates, the steady state volume, and the time-of-day along the timeline displays to simulate realistic traffic loading of the telecommunication system.
Independent claims9
14 paragraphs in 4 sections, as filed
BACKGROUND OF THE INVENTION
0001The present invention relates to telecommunication system testing, and more particularly to a timeline presentation and control of simulated load traffic.
0002In telecommunication systems having nodes, such as central terminals or base stations, and a plurality of terminals or handsets, communication between users at the terminals or handsets is routed along different routes via the nodes. If a large number of users are making calls simultaneously, a particular node may be overwhelmed and some information content may get lost. To simulate such a system in order to provide a design that does not get overwhelmed by a large number of users requires the specification of test traffic flows for a huge number of active subscribers. Such specification is complex and unwieldy to generate, is laborious and time consuming.
0003What is desired is a technique for determining the telecommunication system behavior under various traffic loads corresponding to a huge number of active subscribers that is easy and intuitive to use.
0004In this context, reference is made to <patcit id="pcit0001" dnum="WO0177880A2"><text>WO 01/77880 A2</text></patcit>, which discloses an authoring system for combining temporal and non-temporal digital media. The authoring system has a graphical user interface enabling interactive authoring of a multi-media presentation including temporal and non-temporal media. The graphical user interface enables specification of the temporal and spatial relationships among the media and playback of the presentation with specified temporal and spatial relationships. The spatial and temporal relationships among the media may be changed independently of each other. For specifying temporal relationships, a graphical user interface comprises a timeline region including an index track, a video track, a titles track, two audio tracks, three event tracks, and the timeline scale. The timeline scale determines the number of pixels that represent a time unit. The presentation maybe viewed interactively under the control of the author during the authoring process without encoding the audio and video data into a streaming media data file for combination with the other media, simulating behavior of a browser that would receive a streaming media data file.
BRIEF SUMMARY OF THE INVENTION
0005The present invention provides a timeline presentation and control of simulated traffic by sub-dividing call traffic into sub-groups of call traffic that have a common characteristic as defined in claims 1 and 6. Such sub-groups may include rush hour callers, lunch time callers, teenagers, internet surfers, business customers and other background callers that do not fit into any one sub-group. Each sub-group is represented as a timeline on a display where the traffic for the sub-group is simulated with ramp up and decline rates corresponding to the rate at which calls are added to the system or disconnected from the system and with steady state volume between the ramp up and decline, all as a function of time-of-day. The timelines may be manipulated by graphically changing the rates, steady state volume and time-of-day for the events. In this manner realistic traffic loads on the system may be simulated to determine times and nodes when and where the system may be overwhelmed.
0006Further embodiments according to the present invention are defined in the dependent claims.
0007The objects, advantages and other novel features of the present invention are apparent from the following detailed description when read in conjunction with the appended claims and attached drawing.
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWING
0008<figref idref="f0001">Fig. 1</figref> is a graphic display view of a timeline presentation according to the present invention.
DETAILED DESCRIPTION OF THE INVENTION
0009In order to reduce the problem of specifying test traffic flows for a huge active number of subscribers, or users, on a mobile telecommunication system, the present invention provides a way to allow an operator of a traffic load simulator to manipulate smaller sub-sets of subscribers that have a common characteristic. One common way to think about mobile users is perhaps by time-of-day events that are common for many people - such as rush hours. The time-of-day events may be over a portion of a day or over many days, since some system operators run multi-day tests. Knowing system behavior under the transient harmonic-convergence of peaky traffic groups is the objective of testing. Therefore by splitting traffic into time-of-day events, a timeline may be built to simulate how real-world traffic comes and goes during the day on the system.
0010Major traffic groups of users may be segregated into small clusters that may be represented by a few traffic profiles that have something in common - short voice calls, "gold" service, SMS traffic, etc. For each traffic group ramp rates for how fast the traffic ramps up or declines as well as steady state traffic volume between ramp up and decline are high level adjustments. Adjusting a temporal relationship between traffic groups may be a convenient slide-along-the-timeline interface, as is well known in the art. The groupings may occur across many traffic nuances and/or Internet Service Operator (ISO) protocol layers. For example the operator may want to observe video traffic generally, or "Platinum-Level" video traffic for compliance with Service Level Agreements (SLAs).
0011Referring now to <figref idref="f0001">Fig. 1</figref> a graphic display of system traffic load on a traffic load simulator device shows that the traffic load is split into several sub-groups, such as background traffic, rush hour traffic, lunch time traffic, teenager traffic, internet surfer traffic, "gold" level business traffic, etc. In other words for a test period of time an operator specifies that some background traffic persists throughout the test period; that a couple of time-of-day blocks are specified for both morning and evening rush hours - maybe lots of people making short calls or mobile calls requiring hand-offs between nodes that overload base stations; that another group makes calls during the lunch hour; that teenagers after-school make hour-long multi-party calls; and that late-night surfers and gold-level Service Level Agreement business customers who pay the bills form other separate groups.
0012Once modeled like this, it becomes a day in the life of the system element under test. Of course the operator may add impulse traffic events, such as a bad call that ends a Super Bowl game in controversy which may generate a lot of calls in a short period of time, Chinese New Years which may generate a lot of congratulatory calls in a short period of time, etc. These impulse events may be moved around the timeline to coincide or miss other events. The ability to easily go in and change something, like the level of business traffic, makes it easy for an operator to test the system. Also optional looping may be added so tests may simulate real days, or just so a test runs indefinitely.
0013The user may have separate timelines for each of the caller traffic sub-groups as shown, or may merge the separate timelines into a single master timeline so that the impact of variations introduced within the different sub-groups on the overall traffic load pattern may be observed. The operator, using typical computer graphical interface techniques, readily manipulates the different ramp and decline rates and the "steady-state" call volume for each sub-group on the timelines. Although shown as one-dimensional timelines with a constant amplitude for the respective steady-states volumes, the timelines may be represented graphically in two-dimensions as "amplitude" versus time, where "amplitude" represents the number of calls, for example. The ramp up and decline rates correspond to the rates at which calls are added to the overall volume, i.e., connected to the system, or subtracted from the overall volume, i.e., disconnected from the system. By knowing the capacity of the nodes in the system, the timelines may point out times in the day when traffic has to be routed differently to avoid any one node from being overwhelmed, or may indicate the need for additional nodes in the system, or may indicate the need for a particular node to be updated by increasing its capacity.
0014Thus the present invention provides a user interface for a telecommunication system load traffic simulator to build up realistic traffic loads by sub-dividing caller traffic load into sub-groups having a common characteristic, whether by time-of-day or by type of call, and by plotting the sub-groups on a timeline that indicates ramp up and decline rates for each sub-group as well as a steady state volume.
Contents4
1 sheet
Sheet 1
Every citation, both ways
| Document | Relation | Office |
|---|---|---|
| EP0895375A | Cites | European Patent Office (EPO) |
| WO0177880A | Cites | World Intellectual Property Organization (WIPO) |
6 members in 3 offices; this record represents the family
Priority claims2
| Document | Office | Kind | Date |
|---|---|---|---|
| 817734 | United States of America | – | |
| 81773404 | United States of America | A |
Members6
| Document | Office | Kind | |
|---|---|---|---|
| EP1583279A2 | European Patent Office (EPO) | A2 | |
| US2005220282A1 | United States of America | A1 | |
| EP1583279A3 | European Patent Office (EPO) | A3 | |
| US7328141B2 | United States of America | B2 | |
| EP1583279B1This record | European Patent Office (EPO) | B1 | |
| DE602005021270D1 | Germany | D1 |
30 legal events, as 4 offices reported them to INPADOC
Over the term
Point at a mark for the eventEvents
| Event | Code | Office | |
|---|---|---|---|
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal feeWithdrawnR119 | R119 | DE | |
| Notification of lapseLapsedST | ST | FR | |
| Gb: european patent ceased through non-payment of renewal feeCeasedGBPC | GBPC | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| No opposition filed against granted patent, or epo opposition proceedings concluded without decisionGrantedR097 | R097 | DE | |
| No opposition filedOpposition26N | 26N | EP | |
| No opposition filed within time limitOppositionORIGINAL CODE: 0009261PLBE | PLBE | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: NO OPPOSITION FILED WITHIN TIME LIMITSTAA | STAA | EP | |
| Corresponds to:REF | REF | EP | |
| Designated contracting statesAK | AK | EP | |
| European patent grantedGrantedFG4D | FG4D | GB | |
| (expected) grantORIGINAL CODE: 0009210GRAA | GRAA | EP | |
| Grant fee paidORIGINAL CODE: EPIDOSNIGR3GRAS | GRAS | EP | |
| Despatch of communication of intention to grant a patentORIGINAL CODE: EPIDOSNIGR1GRAP | GRAP | EP | |
| Designation fees paidAKX | AKX | EP | |
| First examination report despatched17Q | 17Q | EP | |
| Request for examination filed17P | 17P | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Search report despatchedORIGINAL CODE: 0009013PUAL | PUAL | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Public reference made under article 153(3) epc to a published international application that has entered the european phaseORIGINAL CODE: 0009012PUAI | PUAI | EP |
Numbers
- Publication
- 1583279
- Application
- 50026046
Titles3
- German
- Sichtdarstellung einer simulierten Verkehrsbelastung mit Steuerung der benutzten Zeitspanne
- English
- Timeline presentation and control of simulated load traffic
- French
- Contrôle de la représentation temporelle et visuelle de la simulation de la charge de trafic
Classification
- CPC, 3
- H04L41/22
- H04L41/145
- H04L43/50
- IPC, 2
- H04L12 24
- H04L12 26
Designated states4
- Contracting states, 4
- Germany
- France
- United Kingdom
- Italy