EP1569261A2

Method and apparatus for transferring a substrate carrier

Abstract

In a first aspect, a first method is provided for electronic device manufacturing. The first method includes the steps of (1) receiving a request to transfer a carrier from a first substrate loading station to a second substrate loading station of an electronic device manufacturing facility including a plurality of substrate loading stations (115; 511-515), wherein the facility further includes a plurality of carrier supports (110; 503) coupled to a conveyor system (101; 501) adapted to move the carrier within the facility; (2) assigning one of the plurality of carrier supports to transfer the carrier from the first substrate loading station to the second substrate loading station such that at least one of a time required for the transfer is reduced and balance of the conveyor system is maintained; (3) moving the carrier from the first substrate loading station; and (4) moving the carrier to the second substrate loading station. Numerous other aspects are provided.

EP1569261A2, drawing sheet 1
Sheet 1 of 14

Term

Term ended

Projected expiry passed 28 February 2025, 1.6 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

35 claims: 12 independent, 23 dependent

  1. 1
    A method of electronic device manufacturing, comprising:receiving a request to transfer a carrier from a first substrate loading station to a second substrate loading station of an electronic device manufacturing facility including a plurality of substrate loading stations (115;511-515), wherein the facility further includes a plurality of carrier supports (110;503) coupled to a conveyor system (101;501) adapted to move the carrier within the facility;assigning one of the plurality of carrier supports to transfer the carrier from the first substrate loading station to the second substrate loading station such that at least one of a time required for the transfer is reduced and balance of the conveyor system is maintained;moving the carrier from the first substrate loading station;and moving the carrier to the second substrate loading station.
  2. 6
    The method of any of claims 2 to 5 further comprising determining whether employing the selected carrier support will unbalance the conveyor system (101;501) .
  3. 8
    The method of any of claims 6 or 7 further comprising selecting another one of the plurality of carrier supports (110;503), if a conflict exists with a pending transfer or if the selected carrier support will unbalance the conveyor system.
  4. 10
    The method of any of claims 2 to 9 wherein a pending transfer includes a carrier transfer between substrate loading stations (115;511-515).
  5. 11
    The method of any of claims 2 to 10 wherein determining whether employing the selected carrier support will conflict with a pending transfer is based on at least one of:a first group of parameters including: a velocity of the conveyor system divided by a spacing between adjacent carrier supports (110;503) coupled to the conveyor system;a maximum time required by the first substrate loading station to prepare to place a carrier on the conveyor system;and at least one of a maximum time required by the first substrate loading station to place a carrier onto the conveyor system and a maximum time required by the first substrate loading station to remove a carrier from the conveyor system (101;501) ;and a second group of parameters including: the velocity of the conveyor system divided by the spacing between adjacent carrier supports coupled to the conveyor system;a maximum time required by the second substrate loading station to prepare to remove a carrier from the conveyor system;and at least one of a maximum time required by the second substrate loading station to place a carrier onto the conveyor system and a maximum time required by the second substrate loading station to remove a carrier from the conveyor system.
  6. 12
    An apparatus for electronic device manufacturing, comprising:a control system (123) of an electronic device manufacturing facility adapted to: receive a request to transfer a carrier from a first substrate loading station to a second substrate loading station of the facility, wherein the facility further includes a plurality of carrier supports (110;503) coupled to a conveyor system (101;501) adapted to move the carrier within the facility;assign one of the plurality of carrier supports to transfer the carrier from the first substrate loading station to the second substrate loading station such that at least one of a time required for the transfer is reduced and balance of the conveyor system is maintained;move the carrier from the first substrate loading station;and move the carrier to the second substrate loading station.
  7. 17
    The apparatus of any of claims 13 to 16 wherein the control system is further adapted to determine whether employing the selected carrier support will unbalance the conveyor system (101;501) .
  8. 19
    The apparatus of any of claims 17 or 18 wherein the control system is further adapted to select another one of the plurality of carrier supports (110;503), if a conflict exists with a pending transfer or if the selected carrier support will unbalance the conveyor system.
  9. 21
    The apparatus of any of claims 12 to 20 wherein a pending transfer includes a carrier transfer between substrate loading stations (115;511-515).
  10. 22
    The apparatus of any of claims 12 to 21 wherein the control system is further adapted to determine whether employing the selected carrier support will conflict with a pending transfer based on at least one of:a first group of parameters including: a velocity of the conveyor system divided by a spacing between adjacent carrier supports (110;503) coupled to the conveyor system;a maximum time required by the first substrate loading station to prepare to place a carrier on the conveyor system (101;501) ;and at least one of a maximum time required by the first substrate loading station to place a carrier onto the conveyor system (101;501) and a maximum time required by the first substrate loading station to remove a carrier from the conveyor system;and a second group of parameters including: the velocity of the conveyor system divided by the spacing between adjacent carrier supports coupled to the conveyor system;a maximum time required by the second substrate loading station to prepare to remove a carrier from the conveyor system;and at least one of a maximum time required by the second substrate loading station to place a carrier onto the conveyor system and a maximum time required by the second substrate loading station to remove a carrier from the conveyor system.
  11. 23
    A system for electronic device manufacturing, comprising:a plurality of substrate loading stations (115;511-515) included in an electronic device manufacturing facility;an conveyor system (101;501), having a plurality of carrier supports (110;503) coupled thereto, and adapted to move a carrier within the facility;and a control system, coupled to the plurality of substrate loading stations and the conveyor system, and adapted to: receive a request to transfer a carrier from a first substrate loading station to a second substrate loading station;assign one of the plurality of carrier supports to transfer the carrier from the first substrate loading station to the second substrate loading station such that at least one of a time required for the transfer is reduced and balance of the conveyor system is maintained;move the carrier from the first substrate loading station;and move the carrier to the second substrate loading station.
  12. 28
    The system of any of claims 24 to 27 wherein the control system is further adapted to determine whether employing the selected carrier support will unbalance the conveyor system (101;501) .
  13. 30
    The system of any of claims 28 or 29 wherein the control system is further adapted to select another one of the plurality of carrier supports, if a conflict exists with a pending transfer or if the selected carrier support will unbalance the conveyor system.
  14. 32
    The system of any of claims 23 to 31 wherein a pending transfer includes a carrier transfer between substrate loading stations.
  15. 33
    The system of any of claims 24 to 32 wherein the control system is further adapted to determine whether employing the selected carrier support will conflict with a pending transfer based on at least one of:a first group of parameters including: a velocity of the conveyor system (101;501) divided by a spacing between adjacent carrier supports (110;503) coupled to the conveyor system;a maximum time required by the first substrate loading station to prepare to place a carrier on the conveyor system;and at least one of a maximum time required by the first substrate loading station to place a carrier onto the conveyor system and a maximum time required by the first substrate loading station to remove a carrier from the conveyor system;and a second group of parameters including: the velocity of the conveyor system divided by the spacing between adjacent carrier supports coupled to the conveyor system;a maximum time required by the second substrate loading station to prepare to remove a carrier from the conveyor system;and at least one of a maximum time required by the second substrate loading station to place a carrier onto the conveyor system and a maximum time required by the second substrate loading station to remove a carrier from the conveyor system.
  16. 34
    A method, comprising:providing a plurality of substrate loading stations (115;511-515) each adapted to receive substrate carriers;providing a delivery system adapted to transport substrate carriers between the substrate loading stations, the delivery system including a plurality of carrier supports (110;503) each adapted to support a substrate carrier;providing a control system for controlling transport of substrate carriers between the substrate loading stations;employing the control system to send a transfer command to a first substrate loading station;if the control system is unable to assign a carrier support for a transfer from the first substrate loading station, employing the control system to send a command to the first substrate loading station to cancel the transfer;and employing the control system to retransmit the transfer command to the first substrate loading station after at least one of a delay and a status of one or more carrier supports changes.