EP1569148A2

Systems and methods for automatically determining and/or inferring component end of life (EOL)

Abstract

The present invention relates to a system and methodology for facilitating managing product life cycle. A component that determines relevance of components to a product; an analyzing component (120) that determines, infers or predicts obsolescence, level of risk to EOL of a subset of the components. A substitution component (240) that identifies replacement components and suppliers for the subset of components. A cost analysis component (210) that determines material/components cost savings, and redesign cost implementation and/or redesign cost avoidance.

EP1569148A2, drawing sheet 1
Sheet 1 of 14

Term

Term ended

Projected expiry passed 22 February 2025, 1.6 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

23 claims: 15 independent, 8 dependent

  1. 1
    A system that facilitates managing product life cycle, comprising:a component that determines relevance of components to a product;and an analyzing component that determines, infers or predicts obsolescence and/or Risk to end-of-life (EOL) of a subset of the components.
  2. 6
    The system of one of claims 1 to 5, the substitution component determining cost of the replacement components.
  3. 7
    The system of one of claims 1 to 6, further comprising an artificial intelligence (AI) component that performs a probabilistic based analysis of the obsolescence-related risk, and /or level of risk to EOL associated with the components.
  4. 8
    The system of one of claims 1 to 7, further comprising an artificial intelligence (AI) component that performs a statistical based analysis of the obsolescence-related risk, and/or level of risk to EOL associated with the components.
  5. 9
    The system of one of claims 1 to 8, further comprising an artificial intelligence (AI) component that performs a rule-based analysis of the obsolescence-related risk, and /or level of risk to EOL associated with the components.
  6. 10
    The system of one of claims 1 to 9, further comprising a tracking component that dynamically monitors availability of the subset of components.
  7. 11
    The system of one of claims 1 to 10, further comprising a tracking component that dynamically monitors availability of the replacement components.
  8. 12
    The system of one of claims 1 to 11, further comprising a cost analysis component that determines savings relative to redesign avoidance efforts not previously identified prior to initiating a Materials Risk Analysis.
  9. 13
    The system of one of claims 1 to 12, the substitution component determining cost to implement the replacement components.
  10. 14
    The system of one of claims 1 to 13, the substitution Component determining component cost savings from implementation of the replacement components.
  11. 15
    A computer implemented method to facilitate component management, comprising:identifying the level of component risk to obsolete, EOL or unavailable;determining risk associated with obsolescence, EOL or unavailability of a subset of the components;and determining suitable replacement components for any of the subset of components having an undesirable level of risk.
  12. 18
    The method of claims 15, 16, or 17 further comprising automatically ordering the replacement components.
  13. 19
    The method of one of claims 15 to 18, further comprising performing a probabilistic-based utility analysis in connection with determining suitable replacement components.
  14. 20
    The method of one of claims 15 to 19, further comprising performing a statistical-based utility analysis in connection with determining suitable replacement components.
  15. 23
    A computer implemented system to facilitate component management, comprising:means for identifying the level of component risk to obsolete, EOL or unavailable;means for analyzing risk associated with obsolescence, level of risk to EOL or unavailability of a subset of the components;and means for determining suitable replacement components and suppliers of replacement components for any of the subset of components having an undesirable level of risk.