Nova Patents
EP1552141A1

Hydrogen production from hydro power

Abstract

This record has no abstract on file.

Term

Term ended

Projected expiry passed 1 October 2023, 3 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

31 claims: 2 independent, 29 dependent

  1. 1
    Claims of equivalent WO 2004031575 A1 WHAT IS CLAIMED IS:1. A turbine installation configured for large scale hydrogen production, the installation comprising: - 1.1 a foundation structure separating an upper elevation headwater from a lower elevation tailwater, the foundation structure defining a water passageway extending therethrough between an inlet adjacent the headwater and an outlet adjacent the tailwater;1.2 a runner rotatably supported by the foundation and disposed in the water passageway intermediate the inlet and the outlet so that water flowing through the passageway as a result of head differential causes rotation of the runner;1.3 a generator supported by the foundation and connected to the runner by a rotary shaft for generating electrical power as the runner rotates;and 1.4 an electrolyzer electrically coupled to the generator for receiving the electrical power and producing hydrogen.
  2. 27
    28. A method for performing an economic comparison analysis in a hydroelectric power generating facility, the facility including a turbine driven power generating unit receiving a flow of water through an upstream conduit to generate electrical power, the facility capable of operating in a first mode wherein the generated electrical power is transported away from the facility using a first energy carrier and a second mode of operation in which the generated electrical power is transported away from the facility using a second energy carrier, the method comprising:computing a first economic value for the electrical energy when the first energy carrier is used;computing a second economic value for the electrical energy when the second energy carrier is used;comparing the first economic value with the second economic value to identify the operating mode associated with the higher economic value;and operating the turbine facility in the identified operating mode.