Method and network entity, for adaptive reservation of channelization codes and power
18 claims: 6 independent, 12 dependent
- 1A method for adaptive setting the reservation of channelization codes and allowed power for a downlink shared channel, DSCH, in a communication network, using parameters ( SF min , P txDSCHallowed ) for minimum allowed Spreading Factor, SF, or allowed power level, the parameters being set depending on traffic load, a total load of a cell and availability of channelization codes, wherein three kinds of measurements are performed:1. average transmitted power of a physical downlink shared channel, PDSCH, 2. relative activity factor, A, of the PDSCH, the relative activity factor A defining the ratio between silence and activity of the PDSCH during an observation period, and 3. weighted code blocking rate, B, the weighted code blocking rate B being defined as the relative time during observation period where a larger bit rate than the actually allocated bit rate could have been allocated to a user equipment according to a link adaption criteria for controlling the downlink shared channel;and adaptive adjustment of a root spreading factor and allowed power for the downlink shared channel is based on these three kinds of measurements.
- 10A network entity for adaptive setting the reservation of channelization codes and allowed power for a downlink shared channel, DSCH, in a communication network, using parameters for minimum allowed Spreading Factor, SF, and allowed power level, the parameters being set depending on traffic load, a total cell load and availability of channelization codes, wherein the network entity is adapted to perform three kinds of measurements:1. average transmitted power of a physical downlink shared channel, PDSCH, 2. relative activity factor, A, of the PDSCH, the relative activity factor A defining the ratio between silence and activity of the PDSCH during an observation period, and 3. weighted code blocking rate, B, the weighted code blocking rate B being defined as the relative time during observation period where a larger bit rate than the actually allocated bit rate could have been allocated to a user equipment according to a link adaption criteria for controlling the downlink shared channel;and to base adaptive adjustment of a root spreading factor and allowed power for the downlink shared channel on these three kinds of measurements.
- 13The network entity of any one of the preceding network entity claims, wherein a criteria for adjustment of the minimum spreading factor, SF min , is:if B is greater than TH B , and A is greater than TH A2 , then decrease SF min , allowing higher bit rates, B representing a weighted code-blocking rate, A an activity factor of the downlink channel, and TH B and TH A2 threshold values.
- 14The network entity of any one of the preceding network entity claims, wherein a criteria for adjustment of the minimum spreading factor, SF min , is:if B = zero, and L code is greater than TH code , then increase SF min , decreasing maximum bit rate, B representing a weighted code-blocking rate, L code a current load of a code tree, and TH code a threshold parameter.
- 15The network entity of any one of the preceding network entity claims, wherein a method for channelization code allocation comprises a step of reserving a new root code with a given spreading factor SF, and a subsequent step of deciding where in a code tree this reservation is to be made.
- 18The network entity of any one of the preceding network entity claims, being adapted to measure the total cell load by measuring power.
Independent claims6
57 paragraphs, as filed
0001The invention generally relates to adaptive reservation of channelization codes and/or power for downlink, preferably for the DSCH, downlink shared channel, and/or the HS-DSCH, high speed downlink shared channel, which is part of the HSDPA, High Speed Downlink Packet Access, concept.
0002The downlink shared channel, DSCH, in UTRAN, Universal Terrestrial RAN (Radio Access Network), is a packet channel which is time shared by multiple users. The DSCH may be mapped to one or multiple PDSCHs, Physical Downlink Shared Channels, having a spreading factor between 4 and 256. The DSCH offers high data-rates and fast scheduling with bit rate modification every 10 ms, which makes it attractive for bursty packet applications such as web browsing, etc. The HS-DSCH can be regarded as an enhanced DSCH which offers bit rate modification every 2 ms as well as adaptive modulation and coding. The HS-DSCH is mapped to HS-PDSCH, high speed physical downlink shared channel.
0003In order to facilitate fast bit rate modification, a certain set of channelization codes is usually reserved for each DSCH as illustrated in Figure 1. This means that time delays due to release and setup of new codes can be avoided. However, this is done at the expense of potentially wasting part of the limited code resources when the PDSCH is using the higher spreading factors. It would therefore be of advantage when the reserved codes are adjusted adaptively according to traffic load in the cell, among others.
0004Link Adaption, LA, techniques are commonly used for control (i.e. bit rate selection) of the DSCH. Link adaption aims at minimizing the transmit power variations of the PDSCHs by transmitting with lower bit rates to user equipments, UEs, which are far from the base station, BS, compared to those close to the BS. The selected bit rate for each UE can be expressed as a function of the power allowed for the PDSCH and the associated DPCH (<i>P<sub>txPDSCHallowed</sub></i> & <i>P<sub>txDPCH</sub></i>), the planned EbNo's for the channels (ρ<i><sub>PDSCH</sub></i> & ρ<i><sub>DPCH</sub></i>), and the bit rate of the associated DPCH (<i>R<sub>DCH</sub></i>) (DPCH = Dedicated Physical Channel). According to the LA criteria, the bit rate to be allocated a user is therefore expressed as <maths id="math0001" num="(1)"><math display="block"><msub><mi mathvariant="italic">R</mi><mrow><mi mathvariant="italic">DSCH</mi><mo mathvariant="italic">,</mo><mi mathvariant="italic">LA</mi></mrow></msub><mo mathvariant="italic">=</mo><mi mathvariant="italic">Round</mi><mfenced open="{" close="}" separators=""><mfrac><msub><mi mathvariant="italic">P</mi><msub><mi mathvariant="italic">txPDSCHallowed ρ</mi><mi mathvariant="italic">DPCH</mi></msub></msub><mrow><msub><mi mathvariant="italic">P</mi><mi mathvariant="italic">txDPCH</mi></msub><mo></mo><msub><mi mathvariant="italic">ρ</mi><mi mathvariant="italic">PDSCH</mi></msub></mrow></mfrac><mo></mo><msub><mi mathvariant="italic">R</mi><mi mathvariant="italic">DCH</mi></msub></mfenced></math><img file="EP1512304B1_D0001.tif" /></maths> where <i>Round{}</i> denotes truncation to the nearest possible bit rate. That can e.g. be 32 kbps, 64 kbps, etc., depending on the reserved channelization codes. Knowledge of <i>P<sub>txDPCH</sub></i> is obtained through average measurements.
0005Provided that there are sufficient data to be transmitted on the PDSCH, the LA algorithm will automatically result in the following property: <maths id="math0002" num="(2)"><math display="block"><mi mathvariant="italic">E</mi><mfenced open="{" close="}"><msub><mi mathvariant="italic">P</mi><mi mathvariant="italic">txPDSCH</mi></msub></mfenced><mo mathvariant="italic">≅</mo><msub><mi mathvariant="italic">P</mi><mi mathvariant="italic">txPDSCHallowed</mi></msub><mo mathvariant="italic">,</mo></math><img file="EP1512304B1_D0002.tif" /></maths> where the mathematical operator <i>E</i>{ } takes the expectation over time. If the relation in equation (2) is false, then it indicates that the DSCH is being poorly exploited. Various reasons for this could be that too much power has been reserved for the PDSCH under the given traffic load or that channelization code blocking is occurring, where the intended LA bit rates according to equation (1) are limited by the minimum allowed spreading factor, i.e. <i>R<sub>DSCH</sub><R<sub>DSCH,LA</sub></i>. Even though equation (2) is valid, there might still be room for optimization by allowing a larger fraction of power to be reserved for the PDSCH. Effective utilization of the DSCH by using LA does therefore depend on the settings of <i>P<sub>txDSCHallowed</sub></i> and the spreading factor of the root channelization code, <i>SF<sub>min</sub></i>.
0006<patcit id="pcit0001" dnum="EP1209936A"><text>EP-A-1 209 936</text></patcit> relates to packet transmission scheduling and specifically to UMTS packet transmission scheduling, for providing a packet transmission scheduling on downlink shared channels. For quality of service, QoS, scheduling of multiple data flows in a CDMA system, a priority order of protocol data units, (PDU, of multiple data flows is determined with regard to predefined quality of service requirements. Transport block sets (TBS) are dynamically created for transmitting to the physical layer (PHY-layer) with regard to the defined priority order and dependent on allocated radio resource constraints.
0007<patcit id="pcit0002" dnum="WO0245291A"><text>WO-A-02/45291</text></patcit> discloses a method and system in which a common data rate target is defined for a user equipment that may share communication channels when communicating with a base station. An average transmission power used for communication between the user equipment and said station is defined. A data rate is allocated for said user equipment based on the determined average transmission power and a common data rate target.
0008<nplcit id="ncit0001" npl-type="s"><text>Borgonovo F et al: "Packet service in UMTS: delay-throughput performance of the downlink shared channel", Computer Networks: The International Journal of Computer and Telecommunications Networking archive, Volume 38 , Issue 1 (January 2002), pages: 43 - 59, 2002, ISSN:1389-1286</text></nplcit>, Abstract, generally mentions that a Universal Mobile Telecommunications System, wide band code-division multiple access (W-CDMA) radio interface provides a variety of different physical and logical channel types such as dedicated channels, DCHs, and downlink shared channel, DSCH, with closed loop power control. Several user rates and protections are possible by choosing suitable parameters such as spreading factors, SFs, code rates and automatic repeat request, ARQ, schemes. Simulation results regarding the effect of several parameters and system alternatives on the capacity of the downlink segment of the W-CDMA interface with packet service are described, including the effect of the SF, the code rate, the ARQ and the power control on the DSCH capacity and delay-throughput performance.
0009<patcit id="pcit0003" dnum="EP1035676A"><text>EP-A-1 035 676</text></patcit> discloses a method of communicating a selected channelisation code for a downlink channel to a user, wherein a set of nodes of a code tree is transmitted which comprises a defined path of the tree for the user. Further, an identifier is transmitted which identifies one of the set of nodes to be used.
0010It is an object of the present invention to provide for adaptive setting the reservation of channelization codes and power for the downlink, e.g. DSCH and HS-DSCH.
0011According to the present invention this object is achieved by a method according to any of the method claims or a network entity according to any of the network entity claims.
0012The invention allows adaptive reservation of channelization codes and power preferably for DSCH and HS-DSCH.
0013The adaptive setting or reservation of codes and/or power can be conducted per logical cell. There is no coordination between setting or reservation of codes or power resources from one cell to another.
0014It is one of the advantages of the invention that the reserved codes are adjusted adaptively according to traffic load in the cell, among others.
0015The presented algorithm opens for effective utilization of the DSCH when using link adaptation techniques, as well as the HS-DSCH, especially for cases where the BS carriers a mixture of RT, Real Time, and NRT, Non Real Time, users, which are mapped to different channel types, such as FACH (Forward Access Channel), DCH (Dedicated Channel), DSCH (Downlink Shared Channel), and HS-DSCH (High Speed Downlink Shared Channel). The algorithm optimizes the usage of both code and power resources. This will in general result in a capacity gain or improved quality in terms of lower queuing times for NRT user, less blocking/dropping, etc.
0016As mentioned above, the algorithm provides a gain in terms of increased system capacity and/or quality for cells using the DSCH and/or HS-DSCH.
0017The presented algorithm allows effective utilization of the DSCH when using link adaptation techniques as well as the HS-DSCH.
0018The invention also presents a territory method for channelization code allocation. The following definitions of code territories is introduced: <ul id="ul0001" list-style="dash" compact="compact"><li>Dedicated DSCH capacity</li><li>Default DSCH capacity</li><li>Additional DSCH capacity</li></ul>
0019Further features and advantages of the present invention are defined in the following.
<u style="single">BRIEF DESCRIPTION OF THE DRAWINGS</u>
0020<ul id="ul0002" list-style="none"><li>Fig. 1 shows a schematic block diagram illustrating DSCH code allocation policy in an embodiment of the present invention,</li><li>Fig. 2 illustrates an example of allocated bit rates and Tx power for the DSCH in an embodiment of the invention,</li><li>Fig. 3 shows another example of allocated bit rates and Tx power for the DSCH in an embodiment of the invention,</li><li>Fig. 4 illustrates further examples of the DSCH behaviour before and after adjustment of the reserved Tx power level in an embodiment of the invention,</li><li>Fig. 5 shows an illustration of territory regions for DSCH/HS-DSCH code allocation schemes according to embodiments of the invention, and</li><li>Fig. 6 shows a schematic block diagram illustrating an embodiment of the present invention.</li></ul>
0021In the following, embodiments will be described in more detail.
0022As mentioned above, effective utilization of the DSCH by using LA depends on the settings of <i>P<sub>txDSCHallowed</sub></i> and the spreading factor of the root channelization code, <i>SF<sub>min</sub></i>. The present invention provides adaptive algorithms for adjustment of these parameters.
0023Once it has been decided which spreading factor the root code should have, the next task is to determine which node in the tree to reserve. An algorithm for this part is also disclosed herein. This algorithm is basically based on a dynamic territory partition of the code tree, which is derived to avoid situations where the code tree becomes highly fragmented. Using this approach, a trunking efficient solution is provided for typical scenarios where the code tree is shared between user equipments (UEs) on DCH, DSCH, FACH, etc.
0024The HS-DSCH specified within 3GPP, as part of the HSDPA concept, also requires adaptive algorithms for reservation of code resources as well as power levels. This is basically due to the fact that it is assumed within 3GPP, that the HS-DSCH is operated with constant power, i.e. no power control.
0025The constant HS-DSCH power level should, however, be periodically adaptively adjusted according to load conditions in the cell as well as other factors. The algorithm specified in the present invention is therefore equally applicable to HS-DSCH. This applies also for cases where the code resources for the HS-DSCH is changed dynamically in order to facilitate variable bit rates and for cases where varying number of multi codes are applied.
0026In the following, the adaptive adjustment of root spreading factor and DSCH power will be described. The optimum setting of the two parameters (<i>P<sub>txDSCHallowed</sub></i> and <i>SF<sub>min</sub></i>) depends on the traffic load as well as the total cell load (measured by power) and the availability of channelization codes. These factors are all considered to be time-variant, which leads to the conclusion that <i>P<sub>txDSCHallowed</sub></i> and <i>SF<sub>min</sub></i> preferably are adaptively adjusted in order to optimize the overall cell performance. It is proposed here to base the adaptation on three kinds of measurements, seen over a certain observation period. These measurements are: <ul id="ul0003" list-style="none" compact="compact"><li>1) the average transmitted power of the PDSCH, <i>P<sub>txDSCxest</sub></i></li><li>2) the relative activity factor A of the PDSCH. The activity factor A, equals zero if the PDSCH is silent during the observation and 0.5 if the DSCH is active 50% of the time with the observation period. Hence, A ranges from 0 to 1. ;</li><li>3) the weighted code-blocking rate, B. This factor is defined as the relative time during the observation period, where a larger bit rate could have been allocated to a UE according to the LA criteria in equation (1) compared to the actually assigned bit rate when taking the minimum allowed SF into account. Hence, B ranges from 0 to 1. If <i>B</i>=0, then it indicates that at no time during the observation period did it occur that the minimum allowed SF was too high.</li></ul>
0027In order to further underline the meaning of these measures, let us consider two examples.
0028Fig. 2 shows an example where three different UEs have been transmitted on the PDSCH during the observation period. UE #3 is apparently located close to the BS, since it has the highest bit rate. UE #1 is far from the BS, since it has been allocated a relative low bit rate. During the last scheduling window in the observation period, there are no data available for transmission on the DSCH. This gap in the transmission is typically too short for dedicated channels to be scheduled during this period, i.e. some capacity is wasted.
0029For this particular case, we have <i>A</i>=0.75, <i>B</i>=0 (<i>R<sub>DSCHmax</sub></i> is not exceeded), and <i>P<sub>txDSCHest</sub></i>=0.75<i>P<sub>txDSCHallowed</sub></i>.
0030Fig. 3 presents another case, where UE #3 actually could have been allocated a higher bit rate according to the LA criteria (1), but a lower bit rate was allocated according to the minimum allowed SF. The lower bit rate for UE #3, automatically results in a lower average Tx power during the period where UE #3 is receiving data. This is not desirable according to the LA criteria expressed in (2), i.e. a lower minimum SF should be reserved (if possible).
0031For this particular case, we have A=1.0 , B=0,25 (25% of the time a higher bit rate could have been assigned), and P<sub>txDSCHest</sub><P<sub>txDSCHallowed</sub>.
0032Based on these examples, four simplified criterias are proposed for adjustment of the allowed power level and the minimum allowed SF.
0033If A is smaller than TH<sub>A1</sub>, and <i>P<sub>txDSCxest</sub></i> is smaller than <i>P<sub>txPDSCHallowed</sub></i> minus a certain defined or set value (e.g. threshold value) X (<i>A</i><<i>TH<sub>A1</sub></i> and <i>P<sub>txDSCHest</sub></i>< (<i>P<sub>txPDSCHallowed</sub></i> - X)), then decrease the reserved power, preferably by the value <i>X</i>, or a fraction thereof.
0034The reason is that when the activity on the DSCH is too low to keep it almost constant busy, one option is to reduce the reserved power level, which automatically will result in smaller assigned bit rates and therefore also longer transmit times, i.e. a higher activity on the channel. This is obvious from equation (1). The threshold parameter <i>TH<sub>A</sub></i> which lies between 0 and 1 and <i>X</i> are strongly related. Assuming that the offered traffic is identical in two consecutive observation periods, it can be shown that setting <i>TH<sub>A</sub></i>=10^(-XdB/10) results in fulfilment of equation (2) in the following observation period provided that <i>A</i>≅<i>TH<sub>A</sub></i> in the previous period.
0035If A is greater than TH<sub>A2</sub>, and <i>P<sub>txDSCHest</sub></i> is greater than <i>P<sub>txPDSCHallowed</sub></i> minus the value X (<i>A</i>><i>TH<sub>A2</sub></i> and <i>P<sub>txDSCHest</sub></i>><i>P<sub>txPDSCHallowed</sub></i> - X), then increase the allowed power, preferably by <i>X</i>.
0036The reason for this is that only when there is constant high activity on the DSCH (e.g. <i>TH<sub>A2</sub></i>=0.9) and the power level is close to or higher than the reserved value, it makes sense to increase the reserved power level. If the activity factor is lower than unity, it implicitly indicates that there are no packets in the queue, i.e. no need for increased power (capacity). However, before we increase the reserved power level, we must of course consider the total power level in the cell in order to avoid saturation or clipping in the downlink power amplifier (PA).
0037If B is greater than TH<sub>B</sub>, and A is greater than TH<i><sub>A2</sub></i> (<i>B</i>><i>TH<sub>B</sub></i> and <i>A> TH<sub>A2)</sub></i>, then decrease <i>SF<sub>min</sub></i> (allowing higher bit rates): The reason herefore is that if it happens more than a certain fraction of the observation period (<i>TH<sub>B</sub></i>∈[0;1]), that higher bit rates than <i>R<sub>DSCHmax</sub></i> are requested according to the LA criteria in equation (1) and the DSCH is constantly busy, then one should try to increase <i>R<sub>DSCHmax</sub></i>, i.e. decrease <i>SF<sub>min</sub></i> with a factor of two. However, one should only perform this action if A is close to unity. If <i>A</i><<1, then it indicates that the DSCH is not constantly busy so a better solution to the problem is probably to lower the reserved power level, i.e. this would reduce the likelihood of code blocking events and help in fulfilment of equation (2).
0038If B equals zero, and <i>L<sub>code</sub></i> is greater than <i>TH<sub>code</sub> (B</i>=0 and <i>L<sub>code</sub></i>><i>TH<sub>code</sub></i>), then increase <i>SF<sub>min</sub></i> (max bit rate is decreased).
0039The reason herefore is that for cases where code limitation problems are absent some of the reserved channelization codes are preferably released by increasing <i>SF<sub>min</sub></i> with a factor of two. This helps to reduce the likelihood of code blocking for DPCHs. However, it only makes sense to increase <i>SF<sub>min</sub></i> if there is a potential need for additional channelization codes. Hence, the action is only performed if <i>L<sub>code</sub></i>><i>TH<sub>code</sub></i>, meaning if the code tree is already heavily loaded. Here <i>TH<sub>code</sub></i> is a threshold parameter and <i>L<sub>code</sub></i> is the current load of the code tree obtained from the resource manager (RM).
0040The effect of the criteria for reducing the reserved power level is illustrated in Fig. 4. The black curves correspond to the high reserved power level, while the blue curve corresponds to the reserved power level after the adjustment. The current example correspond to the case where A=0.5 and <i>P<sub>txDSCHest</sub></i>= 0.5<i>P<sub>txDSCHreserved</sub></i> prior to adjustment, and <i>X</i>=3 dB. For this particular case, as well as for other cases, the problem is obviously solved by reducing the power.
0041The HS-DSCH also benefits from adaptive algorithms for reservation of code resources as well as power levels. The algorithm specified in the present invention is equally applicable the HS-DSCH. Both for cases where the code resources for the HS-DSCH is changed dynamically in order to facilitate variable bit rates.
0042With regard to "territory method" for channelization code allocation: Once it has been decided to reserve a new root PDSCH code with a given SF, the next step is to decide where in the code tree this reservation is to be made. As an example, it is assumed that a code with SF=8 should be reserved. For that particular case there might actually be on the order of 1-6 availavable nodes (codes) in the tree. If one just randomly selects a node in the tree, one eventually reaches a situation where the code-tree becomes highly fracmented and difficult to manage as new users are being admitted and dropped (due to ended calls).
0043In order to avoid such situations, a generic method is proposed here where different strategies for code assignment are used depending on the channel type (say DCH, DSCH, FACH, etc). This method will be called "the territory method" in the sequel.
0044The basic principle for the method is illustrated in Fig. 5, where codes for DSCH (HS-DSCH) basically are assigned in the tree starting from the left according to Fig. 5, or more generally starting from a certain limb of the code tree. Hence, codes assigned for DCH users should primarily be done in the right part of the code tree according to the illustration of Fig. 5, or more generally starting from another limb, different from the certain limb, of the code tree. In order to describe the method the following definitions of code territories are introduced: <ul id="ul0004" list-style="none"><li><b>Dedicated DSCH capacity:</b> In cases where a maximum SF for the DSCH always should be reserved (i.e. guaranteed minimum bit rate), part of the tree is reserved for DSCH and HS-DSCH. The codes in this part of the tree cannot be used for other users, say DCH.</li><li><b>Default DSCH capacity:</b> The default capacity is always allocated to DSCH territory (to be used by HS-DSCH and DSCH) when the total code tree load allows this. This is basically what is expressed in above sections in particular relating to adaptive adjustment of root spreading factor and DSCH power, for the criteria for increase of <i>SF<sub>min</sub></i>. Here the SF is only increased if the code tree is highly loaded.</li><li><b>Additional DSCH capacity:</b> When the default capacity is allocated to the DSCH territory, additional code resources might be needed if the DSCH is highly loaded. The upgrade to a lower SF is done by including part of the codes in the "additional DSCH territory" region, provided that free codes are available. Once the traffic load on the DSCH start to decline and and the criteria for increase of SFmin in the above sections relating to adaptive adjustment of root spreading factor and DSCH power is triggered, the additional DSCH territory is downgraded.</li></ul>
0045The part of the code tree which is used by DSCH (HS-DSCH) is called <b>DSCH_territory.</b> At the start this is set equal to the <b>default DSCH territory,</b> whereafter the <b>DSCH-territory</b> is dynamically updated, based on the load in the different parts of the tree and the criterias listed in the above sections related to adaptive adjustment of root spreading factor and DSCH power.
0046The <b>dedicated DSCH capacity</b> can be used to always guarantee some part of the tree for DSCH (HS-DSCH) users, so they get some service even though the rest of the network for example is occupied by real time users.
0047The <b>additional DSCH capacity</b> can be set to the whole tree, but some part of the tree can be kept out of the additional territory. Advantage of this is that when other users are placed in this part, then they have not to be replaced, when the DSCH territory is to be increased. For this increase it may be necessary to reallocate the RT users in parts of the tree, which belong to the additional territory.
0048Approximate parameter settings corresponding to best mode of algorithm are: <i>TH<sub>A1</sub></i>=0.5, <i>TH<sub>A2</sub></i>=0.9, <i>TH<sub>B</sub></i>=0.1, and <i>TH<sub>Code</sub></i>=0.8. These settings will result in an effective and robust algorithm. However, depending on the actual system configuration there might of course be room for optimization of these parameter settings.
0049One of the preferred methods for operation of the DSCH is to use LA. If LA is applied, adaptive allocation of code and power resources are required in order to ensure effective utilization of the DSCH.
0050The current working assumption within 3GPP is to operate the HS-DSCH channel with constant power. A robust algorithm for adaptive adjustment of the power level as well as reserved code resources are therefore provided by the invention for optimum management of the HS-DSCH.
0051Fig. 6 shows a schematic block diagram illustrating an embodiment of the present invention. A shared channel resource manager 1 (DSCH and/or HS-DSCH) receives several inputs for evaluating and optimising or improving channel resources and/or power. The shared channel resource manager 1 receives measurement results, i.e. data gained by periodical measurement of code tree load, e.g. code blocking (B) and code activity(A), as well as data gained by periodical measurement of average shared channel transmit power. Further, control parameters, preferably external algorithm control parameters (e.g. thresholds TH<sub>A1</sub>, TH<sub>A2</sub>, etc), are supplied to the channel resource manager 1.
0052The channel resource manager 1 generates outputs for controlling code reservation and power, e.g. reserved channelization code(s) (root code for DSCH or number of codes for HS-DSCH), and reserved power. The channel resource manager 1 calculates the reservation of channelization code(s) and power in accordance with the above explained principles.
0053The proposed algorithm runs on cell level.
0054The present invention for code reservation also applies to the channel type HS-DSCH for the HSDPA concept, where the number of codes with SF=16 is adaptively adjusted, i.e. SF is constant.
0055The drawings are self-explanatory and represent full disclosure of aspects of preferred embodiments of the invention of their own value, even regarding those features which are not explicitly described in the above description.
0056While the invention has been described with reference to preferred embodiments, the description is illustrative of the invention and is not to be construed as limiting the invention. Various modifications and applications may occur to those skilled in the art without departing from the scope of the invention as e.g. defined by the appended claims.
6 sheets
Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5 Sheet 6
Every citation, both ways
| Document | Relation | Office |
|---|---|---|
| EP1035676A | Cites | European Patent Office (EPO) |
| EP1209936A | Cites | European Patent Office (EPO) |
| WO0245291A | Cites | World Intellectual Property Organization (WIPO) |
| BORGONOVO F ET AL: "Packet service in UMTS: delay-throughput performance of the downlink shared channel" COMPUTER NETWORKS, 15 JAN. 2002, ELSEVIER, NETHERLANDS, vol. 38, no. 1, pages 43-59, XP002230031 ISSN: 1389-1286 | Non-patent | – |
17 members in 8 offices
Priority claims4
| Document | Office | Kind | Date |
|---|---|---|---|
| 0202181 | International Bureau of the World Intellectual Property Organization (WIPO) | W | |
| 0202181 | International Bureau of the World Intellectual Property Organization (WIPO) | W | |
| IB2002002181 | – | – | – |
| WO2002IB02181 | – | – | – |
Members17
| Document | Office | Kind | |
|---|---|---|---|
| WO03107707A1 | World Intellectual Property Organization (WIPO) | A1 | |
| AU2002258112A1 | Australia | A1 | |
| EP1512304A1 | European Patent Office (EPO) | A1 | |
| CN1628478A | China | A | |
| US2005226267A1 | United States of America | A1 | |
| JP2005536086A | Japan | A | |
| JP3980029B2 | Japan | B2 | |
| EP1512304B1This record | European Patent Office (EPO) | B1 | |
| AT385389T | Austria | T | |
| ATE385389T1 | Austria | T1 | |
| EP1898535A2 | European Patent Office (EPO) | A2 | |
| DE60224891D1 | Germany | D1 | |
| EP1898535A3 | European Patent Office (EPO) | A3 | |
| CN100441025C | China | C | |
| CN101388747A | China | A | |
| DE60224891T2 | Germany | T2 | |
| US7650154B2 | United States of America | B2 |
50 legal events, as 6 offices reported them to INPADOC
Over the term
Point at a mark for the eventEvents
| Event | Code | Office | |
|---|---|---|---|
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal feeWithdrawnR119 | R119 | DE | |
| Notification of lapseLapsedST | ST | FR | |
| Gb: european patent ceased through non-payment of renewal feeCeasedGBPC | GBPC | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| No opposition filedOpposition26N | 26N | EP | |
| No opposition filed within time limitOppositionORIGINAL CODE: 0009261PLBE | PLBE | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: NO OPPOSITION FILED WITHIN TIME LIMITSTAA | STAA | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Patent ceasedCeasedPL | PL | CH | |
| Fr: translation filedET | ET | EP | |
| Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents actLapsedNLV1 | NLV1 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Corresponds to:REF | REF | EP | |
| European patents granted designating irelandGrantedFG4D | FG4D | IE | |
| European patent takes effect as a national patent in ch/liEP | EP | CH | |
| Designated contracting statesAK | AK | EP | |
| European patent grantedGrantedFG4D | FG4D | GB | |
| (expected) grantORIGINAL CODE: 0009210GRAA | GRAA | EP | |
| Grant fee paidORIGINAL CODE: EPIDOSNIGR3GRAS | GRAS | EP | |
| Title (correction)METHOD AND NETWORK ENTITY, FOR ADAPTIVE RESERVATION OF CHANNELIZATION CODES AND POWERRTI1 | RTI1 | EP | |
| Despatch of communication of intention to grant a patentORIGINAL CODE: EPIDOSNIGR1GRAP | GRAP | EP | |
| First examination report despatched17Q | 17Q | EP | |
| Information on inventor provided before grant (corrected)RIN1 | RIN1 | EP | |
| Information on inventor provided before grant (corrected)RIN1 | RIN1 | EP | |
| Information on inventor provided before grant (corrected)RIN1 | RIN1 | EP | |
| Request for extension of the european patent (deleted)DAX | DAX | EP | |
| Request for examination filed17P | 17P | EP | |
| Designated contracting statesAK | AK | EP | |
| Request for extension of the european patentAX | AX | EP | |
| Public reference made under article 153(3) epc to a published international application that has entered the european phaseORIGINAL CODE: 0009012PUAI | PUAI | EP |
Numbers
- Publication
- 1512304
- Publication, DOCDB
- 1512304
- Publication, EPODOC
- EP1512304
- Application
- 2727972
- Application, DOCDB
- 02727972
- Application, EPODOC
- EP20020727972
Titles3
- German
- VERFAHREN UND NETZWERKENTITÄT ZUR ADAPTIVEN RESERVIERUNG VON KANALISIERUNGSKODES UND LEISTUNG
- English
- METHOD AND NETWORK ENTITY, FOR ADAPTIVE RESERVATION OF CHANNELIZATION CODES AND POWER
- French
- PROCEDE ET ENTITE DE RESEAU DE RESERVATION ADAPTATIVE DE CODES DE DECOUPAGE EN CANAUX ET DE PUISSANCE
Classification
- CPC, 6
- H04W52/322
- H04J13/16
- H04W52/143
- H04W52/34
- H04W52/343
- H04W72/52
- IPC, 11
- H04Q7 38
- H04B7 005
- H04B1 707
- H04B7 26
- H04J11 00
- H04J13 00
- H04J13 16
- H04W52 14
- H04W52 32
- H04W52 34
- H04W72 04
Designated states1
- Contracting states, 1
- Türkiye