EP1366400A2

Fiducial technique for estimating and using degradation levels in a process plant

Abstract

This record has no abstract on file.

Term

Term ended

Projected expiry passed 28 February 2022, 4.6 years ago.

  1. Priority and filed
  2. Published
  3. Projected expiry
  4. Today

35 claims: 3 independent, 32 dependent

  1. 1
    Claims of equivalent WO 02071172 A2 CLAIMS What is claimed is:1. A method of using a degradation level of a process entity within a process plant, comprising: estimating a level of degradation of the process entity at a first time based on one or more process parameters associated with the process entity;comparing the estimated level of the degradation of the process entity at the first time to a predetermined desired level of degradation of the process entity at the first time;and altering the operation of the process entity based on the comparison step to drive an estimated level of degradation of the process entity at a second time after the first time to be approximately equal to a predetermined desired level of degradation at the second time, wherein the predetennined desired level of degradation at the second time is greater than the predetermined desired level of degradation at the first time.
  2. 17
    A process control system adapted to use a degradation level of a process entity within a process plant that has a processor communicatively connected to multiple process devices, comprising:a memory;a first routine stored on the memory and adapted to be executed on the processor to estimate a level of degradation of the process entity at a first time based on one or more process parameters associated with the process entity;a second routine stored on the memory and adapted to be executed on the processor to compare the estimated level of the degradation of the process entity at the first time to a predetermined desired level of degradation of the process entity at the first time;and a third routine stored on the memory and adapted to be executed on the processor to determine an alteration for the operation of the process entity based on the comparison of the second routine to drive the estimated level of degradation of the process entity at a second time after the first time to be approximately equal to a predetermined desired level of degradation at the second time, wherein the predetermined desired level of degradation at the second time is greater than the predetermined desired level of degradation at the first time.
  3. 26
    A method of using a degradation level of a process entity within a process plant, comprising:estimating a level of degradation of the process entity at a first time based on one or more process parameters associated with the process entity;comparing the estimated level of the degradation of the process entity at the first time to a predetermined desired level of degradation of the process entity at the first time;using a result of the comparison detenuined by the step of comparing to produce an index defining a utilization amount of the process entity.