EP0973096A2

Central processing unit monitoring system

Abstract

A central processing unit (CPU) monitoring system is provided for detecting abnormality in a CPU 1. In the CPU monitoring system, a proposal data is outputted from a proposing section 11 in a monitoring unit 10 to a converting section 12 of the unit 10 and an exercise calculating section 3 in the CPU 1. In the converting section 12, a designated converting operation is carried out to output an expected value data to two judging sections 13, 4 in the monitoring unit 10 and the CPU 1. When the expected value data does not coincide with the calculation result, it is judged at the sections 13, 4, that the CPU 1 has an abnormality, so that a fail-safe operation is performed to cut off the power supply for a motor 8. The converting section 12 has only to convert the proposal data into the expected value data simply. Consequently, even if the CPU 1 is subjected to modification in control specification, there is no need to change the contents of the CPU 1. Additionally, since it is not necessary for the monitoring unit 10 to have a calculating function identical to that of the CPU 1, the manufacturing cost of the system can be reduced.

EP0973096A2, drawing sheet 1
Sheet 1 of 4

Term

Term ended

Projected expiry passed 8 July 2019, 7.2 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

9 claims: 1 independent, 8 dependent

  1. 1
    A central processing unit monitoring system comprising:a central processing unit (1) for executing a designated control program, the central processing unit (1) including an exercise calculating section (3) for carrying out a predetermined exercise program;and a monitoring unit (10) for monitoring the operation of the central processing unit (1) executing the designated control program;wherein the monitoring unit (10) outputs proposal data ( zc ) to the exercise calculating section (3) and judges whether the central processing unit (1) has an abnormality in the operation on the basis of a calculation result ( bc ) obtained by the exercise calculating section (3) processing the proposal data ( zc ).