Nova Patents
EP0906593A1

Industrial process surveillance system

Abstract

This record has no abstract on file.

Term

Term ended

Projected expiry passed 13 June 2017, 9.3 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

23 claims: 23 independent, 0 dependent

  1. 1
    Claims of equivalent WO 9749011 A1 What is Claimed is:1. A method for monitoring an industrial process and industrial sensor, comprising the steps of: generating time varying data from a plurality of industrial sensors;processing the time varying data to effectuate optimum time correlation of the data accumulated from the plurality of industrial sensors;searching the time correlated data to identify maximum and minimum values for the data, thereby determining a full range of values for the data from the industrial process;determining learned states of a normal operational condition of the industrial process and using the learned states to generate expected values of the operating industrial process;comparing the expected values to current actual values of the industrial process to identify a current state of the industrial process closest to one of the learned states ad generating a set of modeled data;processing the modeled data to identify a pattern for the data ad upon detecting a deviation from a pattern characteristic of normal operation, a alarm is generated.
  2. 2
    The method as defined in Claim 1 wherein the industrial process comprises a physical process.
  3. 3
    The method as defined in Claim 1 wherein the industrial process comprises a financial process.
  4. 4
    The method as defined in Claim 1 wherein the step of determining optimum time correlation comprises comparing pairs of sensor signals, each characteristic of a separate sensor and calculating a cross correlation vector over time, applying a low pass filter to remove noise from the cross correlation vector and determining phase shift between the sensor signals.
  5. 5
    The method as defined in Claim 4 wherein the step of determining phase shift comprises differentiating the cross correlation vector with respect to lag time between each pair of signals and performing an interpolation to compute the root of the differential of the cross correlation vector.
  6. 6
    The method as defined in Claim 1 wherein the step of identifying a current state of the industrial process closest to the learned state includes forming a combination of the learned states to identity a true state of the industrial process.
  7. 7
    The method as defined in Claim 6 further including the step of substituting an expected value for incomplete observations of the industrial process.
  8. 8
    The method as defined in Claim 1 wherein the step of detecting a deviation from normal operation comprises applying a sequential probability ratio test to the modeled data.
  9. 9
    The method as defined in Claim 1 wherein the step of detecting a deviation from normal operation comprises performing a pattern recognition analysis using computer means.
  10. 10
    A method for monitoring at least one of an industrial process and an industrial data source, comprising the steps of:generating time varying data from a plurality of industrial data sources;determining learned states of a normal operational condition of the industrial process to use the learned states to generate expected values of the operating industrial process;comparing the expected values to current values of the industrial process to identifying a current state of the industrial process closest to one of the learned states and generating a set of modeled data;processing the modeled data to identify a pattern for the data and upon detecting a deviation from a pattern characteristic of normal operation, an alarm is generated.
  11. 11
    The method as defined in Claim 10 wherein the step of identifying a current state of the industrial process closest to the learned state includes forming a combination of the learned states to identify a true state of the industrial process.
  12. 12
    The method as defined in Claim 10 further including the step of substituting an expected value for incomplete observations.
  13. 13
    The method as defined in Claim 10 wherein the industrial data source is selected from the group consisting of an industrial manufacturing process, a utility operation, a business operation, an investment process, weather forecasting and a transportation system.
  14. 14
    The method as defined in Claim 10 wherein the plurality of industrial data sources comprises a plurality of sensor pairs.
  15. 15
    The method as defined in Claim 10 wherein the step of processing the modeled data comprises applying a SPRT process.
  16. 16
    The method as defined in Claim 10 further including a step of determining time phase shift between the plurality of the time varying data being output. AMENDED CLAIMS [received by the International Bureau 24 October 1997 (24.10.97) ;original claim 1 amended ;new claims
  17. 17
    17-30 added ; remaining claims unchanged (5 pages) ] 1. A method for monitoring at least one of an industrial process and industrial sensors, comprising the steps of:generating time varying data from a plurality of industrial sensors;processing the time varying data to effectuate optimum time correlation of the data accumulated from the plurality of industrial sensors;searching the time correlated data to identify maximum and minimum values for the data, thereby determining a full range of values for the data from the industrial process;determining learned states of a normal operational condition of the industrial process and using the learned states to generate expected values of the operating industrial process;comparing the expected values to current actual values of the industrial process to identify a current state of the industrial process closest to one of the learned states and generating a set of modeled data;processing the modeled data to identify a pattern for the data and upon detecting a deviation from a pattern characteristics of normal operation, an alarm is generated. 2. The method as defined in Claim 1 wherein the industrial process comprises a physical process. 3. The method as defined in Claim 1 wherein the industrial process comprises a financial process. 4. The method as defined in Claim 1 wherein the step of determining optimum time correlation comprises comparing pairs of sensor signals, each characteristic of a separate sensor and calculating a cross correlation vector over time, applying a low pass filter to remove noise from the cross correlation vector and determining phase shift between the sensor signals. 17. A method for monitoring at least one of an industrial process and an individual date source, comprising the steps of: sensing time varying data from at least one industrial data source of an industrial process;determining learned states of a desired operational condition of the industrial process to use the learned states to generate expected values of the industrial process;comparing the expected values to current sensed values of the industrial process to identify a current state of the industrial process closest to one of the learned states and generating data characteristic of the current state;and processing the data that is characteristic of the current state to identify a pattern for the data and upon detecting a deviation from a pattern characteristic of the desired operational condition, a signal is generated indicating at least one of the industrial process and the industrial data source is not of the desired operational condition.
  18. 18
    The method as defined in Claim 17 further including the step of searching the time varying data, before comparing the current actual values to the expected values, to identify minimum and maximum values for the data, thereby establishing a full range of values for the data.
  19. 19
    The method as defined in Claim 18 wherein each said industrial data source is characterized by two data values associated with the minimum and maximum values.
  20. 20
    The method as defined in Claim 17 wherein said step of processing the data characteristic of the current state to identify a pattern comprises applying a sequential probability ratio test.
  21. 21
    The method as defined in claim 20 wherein data that is characteristic of the current state is processed to generate a set of modeled data which is further processed to identify the pattern for the data.
  22. 22
    The method as defined in Claim 17 wherein the industrial process is selected from the group consisting of a manufacturing process, a physical process, a chemical process, a biological process, an electronic process and a financial process.
  23. 23
    The method as defined in Claim 17 further including the step of substituting an estimated signal for said industrial data source upon detecting the deviation from a pattern characteristic of the desired operational condition, thereby replacing a faulted data source enabling continued operation and monitoring of the industrial process.
Independent claims23