EP0901017A2

Method of checking the slump of a ready-mix concrete load

Abstract

A method is described of checking the slump value of a ready-mix concrete load at the point of delivery in a delivery vehicle (10) of the kind having a rotatable drum (11) in which the concrete load is contained. The method comprises determining a measure of the work required to rotate the drum (11) to produce first data, transmitting information to a base (16), the information dependant upon the first data, determining the slump value of the concrete load from the first data either at the point of delivery or from the transmitted information at the base (16) and storing the information or the slump value at the base (16) whereby an independent record of the slump value of the concrete load at the point of delivery is made at the base (16).

EP0901017A2, drawing sheet 1
Sheet 1 of 2

Term

Term ended

Projected expiry passed 28 August 2018, 8.1 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

12 claims: 7 independent, 5 dependent

  1. 1
    A method of checking the slump value of a ready-mix concrete load at the point of delivery in a delivery vehicle (10) of the kind having a rotatable drum (11) in which the concrete load is contained the method comprising determining a measure of the work required to rotate the drum (11) to produce first data, transmitting information to a base (16), the information being dependant upon the first data, determining the slump value of the concrete load from the first data either at the point of delivery or from the transmitted information at the base (16) and storing the information or the slump value at the base (16) whereby an independent record of the slump value of the concrete load at the point of delivery is made at the base (16).
  2. 4
    A method according to any one of the preceding claims characterised in that the slump value of the concrete load is determined at the base (16), and the information which is transmitted comprises the first data or processed first data.
  3. 5
    A method according to any one of the preceding claims characterised in that the slump value of the concrete load is determined at the point of delivery and means (13) are provided on the vehicle (10) to display the slump value of the concrete load the first data and/or the information being stored in an information storage means (14) provided on the vehicle.
  4. 6
    A method according to any one of the preceding claims wherein means (14) are provided on the delivery vehicle (10) for storing the first data and/or the information determined therefrom relevant to the slump value of the concrete load at the point of delivery and the method includes transmitting the information to base (16) by downloading the information at the base (16) or an intermediate station when the delivery vehicle (10) returns to base or travels to the intermediate station.
  5. 8
    A method according to any one of claims 1 to 5 characterised in that the first data and/or the information determined therefrom relevant to the slump value of the concrete load at the point of delivery is transmitted by a radio and/or telegraphic link, the method including comparing the slump value with reference data at the base (16), transmitting a second signal from the base (16) to the delivery vehicle which second signal indicates whether or not the slump value of the concrete load is within a predetermined range.
  6. 9
    A method according to any one of the preceding claims characterised in that the transmitted information contains information concerning the identity of the delivery vehicle (10) and/or the driver of the vehicle and/or the load and/or the location of the point of delivery.
  7. 10
    A method according to any one of the preceding claims characterised in that the method includes monitoring any addition of water to the concrete load subsequent to dispatch of the delivery vehicle from base (16) to produce second data, the transmitted information including information dependant on the second data, the water monitoring being preferred by means of a water feed conduit (23) from a water tank of the delivery vehicle (10) to the drum (11), having thereon a flow sensor (24) which produces the second data dependent upon the amount of water which has flowed through the conduit (23).
  8. 11
    A method according to any one of the preceding claims characterised in that the method comprises determining the slump value of the concrete load at base (16) prior to dispatch of the delivery vehicle by determining a measure of the work required to rotate the drum (11) to produce data and transmitting information dependant upon the data to a control means (20) of the base (16) and storing the slump value thus determined.