Nova Patents
EP0488246B1

Manufacturing planning system

Abstract

This record has no abstract on file.

EP0488246B1, drawing sheet 1
Sheet 1 of 8

Term

Term ended

Expired 27 November 2011, 14.8 years ago.

  1. Priority
  2. Filed
  3. Granted
  4. Expired
  5. Today

2 claims: 1 independent, 1 dependent

  1. 1
    A manufacturing planning system comprising:data input/output means (12) for inputting information on a prearranged number of products and for outputting display information;memory means (11) for storing component information expressing a plurality of components forming a product, and for storing component lead time information expressing the time necessary for manufacturing the components of a product;and work demand calculating means (3) for calculating the work demand of the manufacturing process based on an input of the number of components manufactured in the manufacturing process;characterized by: MRP (material requirements planning) executing means (2) for performing calculation of amount of materials required for manufacturing the components;capacity adjusting means (4) for inputting information on a revised manufacturing process and on a value of production capacity thereof when the production capacity of the manufacturing process is changed;and lead time estimating means (1) for calculating time of production necessary for manufacturing the components based on the work demand of the manufacturing process and the revised production capacity;whereby said manufacturing planning system is arranged in such a way, that when said information on said prearranged number of products is inputted by said input/output means, the following steps are performed: a) the components of a product are determined on the basis of said component information, b) the number of components of the product to be manufactured is calculated on the basis of said inputted information on said prearranged number of products, c) the time necessary for manufacturing the components of the calculated number on the basis of the component lead time information is calculated, and d) a date for production completion and a date of production start at which the manufacturing of the components should be started are outputted on the basis of the time necessary for manufacturing the components and on the basis of the component information, which time is calculated in step c);and whereby, when the capacity of the manufacturing process of the components is changed after the input of said information on said prearranged number of products and after calculation of amount of materials required for manufacturing the components, said calculation being performed by said MRP executing means, the following steps are performed: e) information on the revised manufacturing process and on a value of production capacity thereof are inputted to said capacity adjusting means (4), f) components related to the revised manufacturing process are determined on the basis of manufacturing process information stored in said memory means (11), g) the number of the related components to be manufactured is calculated from the result of a material requirements plan calculated by said MRP executing means, h) the work demand of the revised manufacturing process is calculated by said work demand calculating means (3) from the number of components calculated in step g), i) the time necessary for manufacturing the components is calculated by said lead time estimating means (1) from the work demand of the revised manufacturing process calculated in step h) and from the revised production capacity, and j) the material requirements plan calculation is again performed by said MRP executing means on the basis of the time calculated in step i) as the component lead time, and the date of production completion and the date of production start for the revised manufacturing process are outputted.