EP0306965A2

Method and system for scheduling, monitoring and dynamically managing resources.

Abstract

The invention relates to the method for the prospective scheduling, periodic monitoring and dynamic management of a plurality of interrelated and interdependent resources using a computer system. The method includes providing a data base containing information about the resources and graphically displaying utilization and availability of the resources as a function of time. Indicia can be made to appear on the display to provide visual identification of symbols as well as information about scheduling, status and conflicts involving the resources. In addition, access to the data base can be made available to provide a continuous update of the display so that the display of the resources is for the most recent data in the data base. Access to the data base can also permit the operator to call up a wide variety of information about the resources and can also be used to track events and procedures.

EP0306965A2, drawing sheet 1
Sheet 1 of 11

Term

Term ended

Projected expiry passed 8 September 2008, 18 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

29 claims: 15 independent, 14 dependent

  1. 1
    A method of prospectively planning utilization of a multiplicity of related resources using a computer having a memory, including the steps of:creating a data base of information (Case;Phase) about at least some of said resources;identifying some of said resources as being primary, and other resources as being secondary;establishing temporal relationships between at least some of said resources;prospectively scheduling utilization of at least some of said primary resources and at least some of said secondary resources;determining whether any of said scheduled utilizations of one of said resources is incompatible with the scheduled utilization of the same or another resource;communicating, by means of conflict indicia (C-1, C-2, C-3;C-4, C-5;C-6, C-7, C-8), the existence of any said incompatible scheduled utilizations.
  2. 2
    The method of prospectively planning utilization of a multiplicity of related resources using a computer having a memory, including the steps of:creating a data base of information (Case, Phase) about at least some of said resources;including in said data base permissible and impermissible uses of at least some of said resources;prospectively scheduling utilization of at least some of said resources;searching said data base to determine if any of said scheduled utilizations constitutes an impermissible use;communicating, by means of conflict indicia (C-1, C-2, C3;C-4, C-5;C-6, C-7, C-8), said impermissible scheduled utilizations.
  3. 5
    The method of any one of claims 1 to 4 further comprising an optical display and wherein said communication of at least one of said conflict indicia (C-1, C-2, C-3;C-4, C-5;C-6, C-7, C-8) is accomplished by having same appear on said display.
  4. 10
    The method of any one of claims 1 to 9 further comprising the steps of:obtaining information representing actual utilization of at least one of said resources at a point in time subsequent to the first scheduled utilization of said resource;determining whether said actual utilization is incompatible with any of said temporal relationships or with any information stored in said data base;and communicating, by means of conflict indicia, the existence of any such incompatible utilizations.
  5. 11
    A system for prospectively planning utilization of a multi­plicity of resources, at least some of which are interrelated, comprising:a computer having a memory;a data base stored in said memory containing information (Case, Phase) about at least some of said resources;a set of primary resources and a set of secondary resources;scheduling means for prospectively scheduling utilization of at least some of said primary resources as a function of time;means for comparing at least one of said scheduled utili­zations with at least one other scheduled utilization or with information in said data base, to detect incompati­bilities;and means for communicating, by use of conflict indicia (C-­1, C-2, C3;C4, C-5;C-6, C-7, C-8) the existence of detected incompatibilities.
  6. 15
    The system of any one of claims 11 to 14 wherein said scheduling indicia reflect planned utilization of at least some of said primary resources as a function of time.
  7. 17
    A system for prospectively scheduling, periodic monitoring and managing utilization of a plurality of resources, at least some of which are interrelated, comprising:a computer having a memory;a data base stored in said memory, containing information (Case, Phase) about at least some of said resources;a set of primary resources and a set of secondary resources;scheduling means for prospectively scheduling utilization of at least some of said primary resources as a function of time;means for communicating at least some of said prospectively scheduled utilization information through use of scheduling indicia;means for comparing at least one of said scheduled utili­zations with at least one other scheduled utilization or with information in said data base to detect incompati­bilities;means for communicating, by use of conflict indicia (C-­1, C-2, C-3;C-4, C-5;C-6, C-7, C-8), the existence of detected incompatibilities;means for collecting information about actual utilization of at least one of said primary resources subsequent to the first scheduled use of a resource;means for modifying at least one of said scheduled utili­zations to reflect variances between said actual utilization and said prospectively scheduled utilization.
  8. 21
    The system of any one of claims 17 to 20 wherein at least one of said means for collecting said actual utilization information;said means for inputting said actual utilization status of resources;and said means for collecting information about actual utilization of resources includes real time clock means.
  9. 22
    The system of any one of claims 17 to 21 further com­prising means for detecting modification-caused incompatible utilizations and communicating said detected modification-­caused incompatibilities by use of conflict indicia (C-1, C-2, C-3;C-4, C-5;C-6, C-7, C-8).
  10. 23
    The system of any one of claims 17 to 22 further com­prising optical display means for displaying at least one of said scheduling indicia, said conflict indicia or said status indicia.
  11. 24
    The system of any one of claims 17 to 23 wherein said modifying means includes means for automatically altering at least one of said scheduled utilizations in response to detection of at least one modification-caused incompati­bility.
  12. 25
    The system of any one of claims 11 to 24 wherein at least some of said scheduling, conflict and status indicia appear in the form of a graphical display.
  13. 27
    The system of any one of claims 11 to 26 wherein infor­mation stored in said data base about at least one of said resources can be accessed and made to appear on a/said display.
  14. 28
    The system of any one of claims 18 to 26 further com­prising means for recording the time of said inputting of said actual status utilization data.
  15. 29
    The system of any one of claims 18 to 27 further com­prising means for recording the time of said actual status utilization.