Vacuum deposition system and method
10 claims: 2 independent, 8 dependent
- 1Apparatus for forming a layer of a material upon a surface from a gas comprising:a reservoir (10) for heating a material from which said gas is propagated;a low pressure reactor (20) wherein said layer is formed;connecting means (18) between said reservoir and said reactor;means connected to the outlet of said reactor for creating a vacuum therein and causing said gas to flow from said reservoir through said connecting means to said reactor;first pressure control means at the outlet of said reservoir for maintaining the pressure of said gas at the reservoir end of said connecting means at a first value;and second pressure control means at the inlet of said reactor for maintaining the pressure of said gas thereat at a second value by adjusting said means for creating a vacuum, thereby providing a constant mass flow rate of said gas into said reactor.
- 6Method of forming a layer of material from a gas upon the surface of an object comprising:heating a reservoir to a temperature sufficient to vaporize a material from which said gas is formed;creating a vacuum in a reactor containing said object to cause said gas to flow from said reservoir through a connecting means to said reactor;and maintaining the reservoir outlet pressure and the reactor inlet pressure at constant values, thereby providing a constant mass flow rate of said gas into said reactor.
- 10Method according to any one of claims 6 to 9, wherein said material to be vaporized is tetraethylorthosilicate (TEOS) and said material is silicon dioxide and wherein preferably the pressure in the reservoir is kept at about 10,67 mbar, the pressure at the reservoir end of said connecting means at about 3,07 mbar and at the reactor end of said connecting means at about 1,33 mbar.
Independent claims6
26 paragraphs, as filed
0001The present invention relates generally to vacuum deposition apparatus and deposition methods. More particularly the apparatus and methods are used for chemical vapor deposition in connection with the fabrication of integrated circuit devices.
0002It is well known in fabricating integrated circuit devices to employ vapor phase chemical processes to form layers of various materials on a substrate. For example, one method of forming silicon dioxide on a substrate is a chemical vapor deposition process involving the pyrolysis of tetraethylorthosilicate (TEOS). The TEOS is typically vaporized in a heated reservoir and the vapor is transported to a reaction chamber, which contains the substrates, by an inert carrier gas. This method is disclosed, for example, in U.S. Pat. Nos. 3,243,314 to Lehman et al., assigned to the assignee of the present invention, and 3,556,841 to Iwasa et al.
0003It is important to precisely control the rate of pyrolysis of TEOS in the reaction chamber in order to form a silicon dioxide layer having the desired thickness, uniformity and chemical and electrical characteristics. This, in turn, requires a controlled mass flow or transfer of TEOS from the reservoir to the reaction chamber. In one known method for metering the mass flow rate the temperature of the reservoir containing the liquid to be vaporized is adjusted to provide a constant flux of vapor. Another method, disclosed in U.S. Pat. Nos. 4,393,013 and 4,436,674 to McMenamin, controls the rate that a carrier gas is bubbled through the reservoir to provide a constant flow rate of vaporized fluid, based upon the difference between the actual pressure in the reservoir and a reference pressure.
0004The system described in U.S. Pat. No. 4,341,107 to Blair et al. employs thermal conductivity type mass flow sensors at the inlet and outlet of a reservoir. The sensor measurements are compared to provide a signal, representing the mass flow rate of the vaporized liquid, which is used to control the flow rate of the carrier gas into the reservoir.
0005A reduced pressure chemical vapor deposition system is disclosed in U.S. Pat. No. 3,934,060 to Burt et al. This system uses a vacuum to pull the vaporized source material from a reservoir to a reactor. A predeposition vacuum process is employed to remove impurities first from the TEOS source and then from the wafer carrier and wafers in the diffusion tube or reactor.
0006Systems which adjust the temperature of the reservoir to control the mass flow rate of the vapor to the reactor have an inherently slow response time and thus are prone to wide variations in the thickness and uniformity of the deposited film. In other systems the reservoir geometry and liquid level are critical, and the effects of variations in bubble size are difficult to control in carrier gas type systems. In addition, it is desirable to increase the flow rate and pressure to provide a higher deposition rate while maintaining repeatability from batch to batch and uniformity in thickness and density of the deposited material.
Summary of the Invention
0007It is the object of the present invention to provide an apparatus and a method for forming a uniform layer of a material from a vapor phase onto the surface of an object at a high rate of deposition.
0008It is another object of the present invention to provide a vapor deposition apparatus and method for forming a uniform layer of a material upon a surface at a high deposition rate especially by chemical vapor deposition.
0009A further object of the present invention is to provide a means for precisely controlling the mass flow rate of a heated vapor in a vacuum system.
0010Still another object of the present invention is to provide a vacuum system wherein the vapor mass flow rate is held constant by controlling the pressure near the vapor source and near the vapor using system.
0011These objects are achieved by an apparatus as defined in claim 1 and by a method as defined in claim 6.
0012According to one embodiment of the invention the mass flow rate of the gas from the reservoir is held constant by precisely controlling the pressure at the outlet of the reservoir and at the inlet of the reactor. The upstream pressure is controlled by a valve responsive to a pressure sensor at the reservoir outlet, and the downstream pressure is controlled by adjusting the vacuum in the reactor as measured by a pressure sensor at the reactor inlet.
0013In another embodiment a vacuum bypass line around the reactor is provided to stabilize the upstream pressure prior to admitting the gas to the reactor when a deposition cycle is commenced.
0014According to another aspect of the invention the connection between the reservoir and the reactor, and the flow control valves and pressure sensors in the flow path are maintained at a temperature higher than that of the reservoir to prevent condensation of the vapor downstream of the reservoir.
0015Other advantageous embodiments of the inventive apparatus and the inventive method are disclosed in the subclaims.
0016Other objects and many of the attendant advantages of the present invention will be better understood by reference to the following detailed description in conjunction with the accompanying drawing, which is a schematic diagrammatic view of a vacuum vapor deposition apparatus according to one embodiment of the present invention.
0017Referring now to the drawing figure, there is shown a reduced pressure vapor deposition apparatus in accordance with the principles of the present invention. A reservoir 10 containing a liquid or solid to be vaporized is heated, for example, by a resistance heater 12. The reservoir temperature may be maintained at a desired setpoint by a conventional temperature controller (not shown). A pressure sensor 14 at the reservoir outlet provides a signal corresponding to the reservoir pressure. An adjustable valve 16 downstream of reservoir 10 meters the flow of gas into a vacuum line 18 which connects reservoir 10 to a reduced pressure reactor 20, into which the objects to be coated are placed. The pressure at the reservoir end of line 18 is monitored by a pressure sensor 22 immediately downstream of valve 16, and the pressure at the reactor end of line 18 is monitored by a pressure sensor 24 at the inlet of reactor 20. A vacuum pump 26 connected to the outlet of reactor 20 creates a vacuum in the reactor which causes gas to flow therein from reservoir 10 through line 18. A vacuum line 28 between a second adjustable valve 30 at the reactor 20 inlet and vacuum pump 26 provides a means for bypassing reactor 20 to stabilize the pressure in line 18 at the commencement of a deposition cycle.
0018In the preferred embodiment the apparatus is operated automatically by a controller 32 which monitors a signal from pressure sensor 22 and operates valve 16 in response thereto to maintain the upstream end of line 18 at a constant pressure Pi. The downstream end of line 18 is maintained at a constant pressure P<sub>2</sub> by adjusting the speed of vacuum pump 26 in response to a signal from pressure sensor 24. Alternatively, a butterfly valve or other means upstream of pump 26 may be employed. Bypass valve 30 may be operated manually or by controller 32, and the reservoir 10 pressure signal from sensor 14 may be used to control heater 12.
0019Heating means such as a water jacket 34 maintains the temperature of line 18 and valves 16, 30 above that of reservoir 10 to prevent the gas from condensing as it flows to reactor 20.
0020In operation, the liquid or solid material in reservoir 10 is heated so that its vapor pressure, as indicated by sensor 14, is above a minimum value so that it acts as an overadequate source, while reactor 20 acts as a sink. As described above, controller 32 can be configured to control the heating of reservoir 10, the operation of valve 16 to maintain the upstream pressure at P<sub>i</sub>, the adjustment of vacuum pump 26 to maintain the downstream pressure at P<sub>z</sub>, and the operation of bypass valve 30 to prevent a sudden burst of vapor into reactor 20 at the commencement of a deposition cycle. Since reservoir 10 is operated as an overadequate source, the control of its temperature is not critical as in prior systems. This permits the use of pressure as the parameter for controlling the vapor mass transfer into reactor 20. The fast response time of the pressure sensors coupled with an electronic or programmable controller allows the present apparatus to maintain substantially a constant vapor mass flow rate.
0021The relationship of the pressures in a flow channel to the molecular current or quantity, Q, of vapor flowing past a point in a viscous system is: <ul id="ul0001" list-style="none"><li>Q = C x Pave x Pdiff where</li><li>C = a constant related to the length and cross-section of the flow channel and the vapor viscosity</li><li>Pave = the average pressure in the flow channel or (Pι + P<sub>z</sub>)/2</li><li>Pi = the upstream pressure of the flow channel</li><li>P<sub>2</sub> = the pressure at the downstream end of the flow channel</li><li>Pdiff = the pressure drop along the length of the flow channel or (Pi - Pz)</li></ul>
0022From this equation it can be seen that for a constant vapor viscosity and flow channel dimensions, the mass flow Q will be constant if Pave and P<sub>d</sub>i<sub>ff</sub> are constant, i.e., if P<sub>1</sub> and P<sub>2</sub> are constant. Pi and P<sub>2</sub> correspond to the upstream and downstream pressures in line 18 in the present apparatus. The value range of P<sub>d</sub>iff can be varied by changing the length and cross-section of vacuum line 18.
0023As an illustrative example, an apparatus according to the principles of the present invention was constructed for the low pressure chemical vapor deposition of silicon dioxide by the pyrolysis of TEOS. Reservoir 10 was a conventional quartz bubbler with an integral temperature control unit available, for example, from the Schumacher Co. Reactor 20 was a Crystal Specialties, Inc. low pressure chemical vapor deposition reactor, and line 18 was made of about 6,4 mm (1/4 in.) stainless steel tubing approximately 61 cm long. Pressure sensor 14 was a 0-133,32 mbar and sensors 22 and 24 were 0-13,33 mbar capacitance manometers available, for example, from Vacuum General Corp. or MKS Instruments, Inc., and valves 16 and 30 were conventional electrically operated valves available from Vacuum General Corp. Controller 32 was a Tylan Corp. "Tycom" model programmable process control unit. Vacuum control was effected by a Roots pump speed adjustment.
0024With a reservoir 10 pressure, Po, of about 10,67 mbar and line 18 pressures of approximately P<sub>i</sub> = 3,07 mbar and P<sub>2</sub> = 1,33 mbar, a mass flow rate of about 200 sccm was obtained.
0025There has thus been provided by the present invention an apparatus and method for the precisely controlled delivery of a heated vapor in a vacuum system, which is particularly advantageous in low pressure chemical vapor deposition systems.
1 sheet
Sheet 1
Every citation, both ways
| Document | Relation | Office | Cited during |
|---|---|---|---|
| DE102012203212B4 | Cited by | Germany | Search report |
| DE102012203212A1 | Cited by | Germany | Search report |
| EP0137702A | Cites | European Patent Office (EPO) | – |
| EP0152668A | Cites | European Patent Office (EPO) | – |
| DD216737A | Cites | German Democratic Republic (until 1990) | – |
| DE2653736A | Cites | Germany | – |
| US3271562A | Cites | United States of America | – |
9 members in 5 offices
Priority claims4
| Document | Office | Kind | Date |
|---|---|---|---|
| 79272985 | United States of America | A | |
| 792729 | United States of America | – | |
| US19850792729 | – | – | – |
| 792729 | – | – | – |
Members9
| Document | Office | Kind | |
|---|---|---|---|
| US4640221A | United States of America | A | |
| EP0220552A2 | European Patent Office (EPO) | A2 | |
| JPS62107071A | Japan | A | |
| EP0220552A3 | European Patent Office (EPO) | A3 | |
| CA1228268A | Canada | A | |
| US4717596A | United States of America | A | |
| EP0220552B1This record | European Patent Office (EPO) | B1 | |
| DE3668188D1 | Germany | D1 | |
| JPH0468391B2 | Japan | B2 |
23 legal events, as 3 offices reported them to INPADOC
Over the term
Point at a mark for the eventEvents
| Event | Code | Office | |
|---|---|---|---|
| Gb: european patent ceased through non-payment of renewal feeCeasedGBPC | GBPC | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| European patent in force as of 2002-01-01IF02 | IF02 | GB | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Notification of lapseLapsedST | ST | FR | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| Annual fee paid to national office [announced via postgrant information from national office to epo]GrantedPGFP | PGFP | EP | |
| No opposition filedOpposition26N | 26N | EP | |
| No opposition filed within time limitOppositionORIGINAL CODE: 0009261PLBE | PLBE | EP | |
| Information on the status of an ep patent application or granted ep patentGrantedSTATUS: NO OPPOSITION FILED WITHIN TIME LIMITSTAA | STAA | EP | |
| Fr: translation filedET | ET | EP | |
| Corresponds to:REF | REF | EP | |
| Designated contracting statesAK | AK | EP | |
| Lapsed in a contracting state [announced via postgrant information from national office to epo]LapsedPG25 | PG25 | EP | |
| (expected) grantORIGINAL CODE: 0009210GRAA | GRAA | EP | |
| First examination report despatched17Q | 17Q | EP | |
| Request for examination filed17P | 17P | EP | |
| Designated contracting statesAK | AK | EP | |
| Search report despatchedORIGINAL CODE: 0009013PUAL | PUAL | EP | |
| Designated contracting statesAK | AK | EP | |
| Public reference made under article 153(3) epc to a published international application that has entered the european phaseORIGINAL CODE: 0009012PUAI | PUAI | EP |
Numbers
- Publication
- 0220552
- Publication, DOCDB
- 0220552
- Publication, EPODOC
- EP0220552
- Application
- 86113869
- Application, DOCDB
- 86113869
- Application, EPODOC
- EP19860113869
Titles3
- English
- VACUUM DEPOSITION SYSTEM AND METHOD
- German
- System und Verfahren zur Vakuumabscheidung
- French
- Système et méthode de dépôt sous vide
Classification
- CPC, 1
- C23C16/4485
- IPC, 3
- C23C16 40
- C23C16 448
- C23C16 52
Designated states4
- Contracting states, 4
- Germany
- France
- United Kingdom
- Italy
