EP0164031A2

A coupler device for stressing cables, in prestressed concrete sliding cable structures.

Abstract

A coupling head (10) for structure sections (11, 12) of prestressed concrete comprises a body (24) for anchorage of the strand (13a, b,...) ends relating to a first cast structure section (11) and a plate (32) blockable on the body for anchorage of the strand (15a, b,...) ends relating to a structure section (12) to be subsequently cast; these second ends are enclosed within a perimeter defined by said first mentioned ends.

EP0164031A2, drawing sheet 1
Sheet 1 of 3

Term

Term ended

Projected expiry passed 23 May 2005, 21.3 years ago.

  1. Priority
  2. Filed
  3. Published
  4. Projected expiry
  5. Today

12 claims: 2 independent, 10 dependent

  1. 1
    A coupler device for sliding cable prestress concrete structures, said device being for anchoring the leading strand (13a, b, ...) ends of a stressing cable (13) relating to a previously cast beam or span section (11) and the trailing ends of a cable (15) relating to a successively cast beam section (12), characterized by comprising:a first element or body element (24) having seats (26) for receiving grips (23) for the strand ends relating to the previously cast span section (11);a second element (32) having seats for receiving end grips (36) for the cable (15) relating to the span section (12) to be successively cast, which second element can be clamped with respect to the first element, said seats for the grips of the span section to be successively cast being enclosed within a space defined by the axes of the seats for the cable grips relating to the previously cast beam section.
  2. 3
    A device as claimed in Claim 1, characterized in that said first element (24) comprises a box-like portion (28) for acccmnodating the grips (36) relating to the cable ends of the beam section to be successively cast.
  3. 4
    A device as claimed in Claim 1, characterized in that said first element (24) has a shoulder (25) for bearing on a facing shoulder of a guide element (20) incorporated in an end of the previously cast beam section (11 ).
  4. 5
    A device as claimed in Claim 1, characterized in that said first element (24) comprises a through hole (50) between an outer surface thereof and the space internally defined by said box extension for air vent during injection of cement grout.
  5. 6
    A device as claimed in Claim 1, characterized by further comprising a clamping ring nut (38) having a thread (40) for engagement with a matching thread (30) on the first element (24) for clamping of the second element.
  6. 7
    A device as claimed in Claim 6, characterized in that said ring nut (38) has an offset (42) in an axially outer and radially inner edge to receive one end of a protective carter (44) for the cables.
  7. 8
    A device as claimed in Claim 1, characterized in that said second element (32) is a plate and said seats (34) comprise through holes.
  8. 9
    A device as claimed in Claim 1, characterized in that said seats in the second element comprise radially arranged lobed cavities.
  9. 10
    A coupler assembly mounted in a sliding cable prestressed concrete structure, said coupler being substantially according to Claim 1, said assembly comprising wedge grips (23) for the strand (13a, b, ...) ends relating to the prestress cable (13) of a previously cast span section (11), said assembly further comprising swaged grips (36) relating to the strand ends (15a, b, ...) of the prestress cable (15) of the successively cast span (12).
  10. 11
    A device as claimed in Claim 1, characterized by comprising a guide (20) to be incorporated in the end portion of the section to be previously cast, said guide having radial tabs (102) for centering and bearing a conventional armature.
  11. 12
    A coupler device for sliding cable prestress concrete structures, substantially as herein described and shown in the accompanying drawings.