CA3035540C

Track system for creating finished products

Abstract

A track system includes a primary transport portion and a secondary transport portion along which a plurality of vehicles can be propelled. Each secondary transport portion includes a unit operation station for performing a transformation on a container or the contents therein.

CA3035540C, drawing sheet 1
Sheet 1 of 13

Term

11 yearsleft in the term

Expires 8 September 2037.

  1. Priority
  2. Filed
  3. Granted
  4. Today
  5. Expires

13 claims: 1 independent, 12 dependent

  1. 1
    CLAIMS What is claimed is:1. A transportation system comprising: a plurality of containers for holding a fluent material, said system characterized in that it further comprises a plurality of vehicles for containers, wherein a container is disposed on a respective vehicle to form a container-loaded vehicle, there being a plurality of container-loaded vehicles;a track system comprising a track on which container-loaded vehicles are propellable, said track comprising: a primary transport portion that defines a primary path comprised of track that forms a closed loop that is configured to permit at least one container-loaded vehicle to travel in a holding pattern;at least one secondary transport portion that extends from the primary transport portion and defines a secondary path comprised of track that intersects the primary path at an ingress location and an egress location;and at least one unit operation station disposed along a secondary transport portion and configured to perform a container treatment operation on at least one container-loaded vehicle, wherein the plurality of container-loaded vehicles are independently routable along the track system to deliver at least some of the containers to the at least one unit operation station for performing a container treatment operation on at least some of said containers, wherein at least one of the at least one unit operation station comprises a plurality of independently controllable nozzles for dispensing the fluent material into the containers.
  2. 2
    The system of Claim 1, wherein each vehicle comprises a magnet.
  3. 3
    The system of Claim 2, wherein the track system comprises:one or more running surfaces that support the vehicles;and a plurality of conductive propulsion coils that facilitate routing of the vehicles along the track system along a direction of travel.
  4. 4
    The system of Claim 1, wherein the only type of unit operation station disposed along said primary transport portion comprises a fast cycle unit operation station. Date Reçue/Date Received 2020-05-27
  5. 5
    The system of Claim 1 wherein:the secondary transport portion comprises at least one unit transport segment;and one of the at least one unit operation stations is disposed along the at least one unit transport segment.
  6. 6
    The system according to Claim 5, wherein the secondary transport portion comprises a plurality of unit transport segments that further define the secondary path and w'herein each unit transport segment defines a segment ingress location and a segment egress location.
  7. 7
    The system of Claim 6, wherein each of the plurality of unit transport segments are arranged in parallel.
  8. 8
    The system of Claim 6, wherein the track system further comprises a plurality of unit operation stations each disposed at one of the unit transport segments.
  9. 9
    The system of Claim 1, wherein said plurality of containers comprises a plurality of first containers having a volume and a shape and a plurality of second containers having one or more of a volume and a shape that is different from one or more of the volume and the shape, respectively, of the plurality of first containers.
  10. 10
    The system of Claim 1, wherein the system comprises at least two unit operation stations and one of the at least two unit operation stations comprises a container loading station that is configured to facilitate loading a container onto one of the vehicles.
  11. 11
    The system of Claim 1, wherein the plurality of independently controllable nozzles are configured so that at least one first independently controllable nozzle dispenses a first fluent material that is different from a second fluent material dispensed from at least one second independently controllable nozzle.
  12. 12
    The system of Claim 9, wherein each of the plurality of vehicles is independently routable along the track system to deliver the first and second containers to different unit operation stations;and at least one first vehicle has associated therewith a route that is different from a route associated with an at least one second vehicle, with each of the at least one fust vehicle and the at least one second vehicle executing the associated routes simultaneously. Date Reçue/Date Received 2020-05-27
  13. 13
    The system of Claim 9, wherein each of the plurality of vehicles is configured to accommodate one or more of the different shapes and sizes of the first container and the second container.