Nova Patents
CA2439963C

Offshore floating production method

Abstract

A method of conducting operations to an offshore field from multiple separated drill centers using a floating vessel (42) having a turret-mounted mooring element (44) and a workstation (48) separate from the mooring element (44) in which the vessel (42) is moored at a central mooring element location and operations are sequentially carried out at separate drill centers associated with the mooring element location by allowing the vessel (42) to weathervane to a heading associated with a subsequent drill center once operations have been completed at a first drill center.

CA2439963C, drawing sheet 1
Sheet 1 of 8

Term

Term ended

Expired 10 April 2022, 4.5 years ago.

  1. Priority
  2. Filed
  3. Granted
  4. Expired
  5. Today

11 claims: 2 independent, 9 dependent

  1. 1
    CA 02439963 2003-09-02 WO 02/088509 PCT/US02/11022 What is claimed is:1. A method of conducting operations to an offshore field from multiple separated drill centers, the method using a floating vessel having a turret-mounted mooring element positioned at or near one end of the vessel which allows the vessel to weathervane and further having a workstation horizontally spaced apart from the mooring element, comprising the steps of: (a) locating the mooring element approximately over a first mooring element location;(b) limiting the horizontal movement of the mooring element using a plurality of mooring lines extending from the mooring element;(c) allowing the vessel to weathervane such that the workstation is substantially vertically aligned over a first drill center associated with the first mooring element location;(d) temporarily restraining the weather-vaning of the vessel;(e) using the workstation to conduct operations in at least one well from the first drill center to the field;(f) removing the weather-vaning restraint while continuing to limit horizontal movement of the moving element and repeating steps (c), (d) and (e) for one or more additional drill centers associated with the first mooring element location.
  2. 8
    9. A method of conducting operations to an offshore field from multiple separated drill centers, the method using a floating vessel having a turret-mounted mooring element positioned at or near one end of the vessel which allows the vessel to weathervane and further having a first workstation horizontally spaced apart from the mooring element and further having a second workstation, comprising the steps of:CA 02439963 2003-09-02 WO 02/088509 PCT/US02/11022 (a) locating the mooring element approximately over a first mooring element location;(b) limiting the horizontal movement of the mooring element using a plurality of mooring lines extending from the mooring element;(c) allowing the vessel to weathervane such that the first workstation is substantially vertically aligned over a first drill center associated with the first mooring element location;(d) temporarily restraining the weather-vaning of the vessel;(e) using the first workstation to conduct operations in at least one well from a first segment of the first drill center while simultaneously using the second workstation to conduct operations in a well from a second segment of the first drill center;(f) removing the weather-vaning restraint while continuing to limit horizontal movement of the moving element and repeating steps (c), (d) and (e) for one or more additional drill centers associated with the first mooring element location.