CA2401705C

Wireless downhole measurement and control for optimizing gas lift well and field performance

Abstract

A method for optimizing the production of a petroleum well is provided. The petroleum well includes a borehole, a piping structure (24) positioned within the borehole, and a tubing string (26) positioned within the borehole for conveying a production fluid. Production of the well is optimized by determining a flow rate of the production fluid within the tubing string (26) and determining a lift-gas injection rate for the gas being injected into the tubing string. The flow rate and injection rate data is communicated along the piping structure of the well to a selected location (44), where the data is collected and analyzed. After analysis of the data, an optimum operating point (152) for the well can be determined

CA2401705C, drawing sheet 1
Sheet 1 of 11

Term

Term ended

Expired 2 March 2021, 5.6 years ago.

  1. Priority
  2. Filed
  3. Granted
  4. Expired
  5. Today

28 claims: 3 independent, 25 dependent

  1. 1
    CA 02401705 2012-09-07 63293-3892 CLAIMS:1. A gas lift well comprising: a tubing string positioned within the borehole for delivering a production fluid from downhole to the surface;5 an induction choke positioned around the tubing string;wherein the tubing string acts as an electrical conductor and the induction choke serves as a series impedance device to electrical current flow;a downhole device that is electrically coupled to the tubing string;a downhole measurement system for determining a flow rate of the 10 production fluid within the tubing string;and a sensor for determining the lift gas injection rate;and a communication system operably associated with the tubing string such that flow rate data from the downhole measurement system can be communicated along the tubing string. 15
  2. 13
    A method for optimizing the production of fluid in a petroleum well having a borehole and a piping structure positioned within the borehole, comprising the 15 steps of:determining a flow rate of the production fluid downhole in the borehole using a sensor positioned downhole in the borehole and powered using the piping structure as an electrical conductor;determining a lift-gas injection rate for an amount of lift-gas being 20 injected into the well;communicating the flow rate data and the lift-gas injection rate data;and collecting and analyzing the flow rate data and the lift-gas injection rate data to determine an optimum operating point for the petroleum well, further comprising operating the well at the optimum operating point;and CA 02401705 2012-09-07 63293-3892 wherein the communicating step further comprises the steps of defining a transmission section of the piping structure using at least in part an induction choke positioned around the piping structure;and communicating the data along the transmission section of the piping structure. 5
  3. 23
    A method for optimizing production of fluid in a petroleum field having a plurality of petroleum wells and a piping structure disposed within the borehole of a number of wells, comprising the steps of:determining a flow rate for the production fluid within the piping structure 15 of a number of the petroleum wells;communicating the flow rate data along the piping structure to a surface computer for a number of the petroleum wells;determining a lift-gas injection rate for an amount of lift-gas being injected into the piping structure of each of the petroleum wells;20 communicating the lift-gas injection rate data to a surface computer for a number of the petroleum wells;and collecting and analyzing the flow rate data and the lift-gas injection rate data supplied by each of the wells to determine an optimum operating point for the petroleum field;25 wherein the communicating step further comprises the steps of: CA 02401705 2012-09-07 63293-3892 positioning an induction choke around the piping structure to define a transmission portion;and communicating the flow rate data along the transmission portion of the piping structure, 5 further comprising the step of operating the petroleum field at an optimum operating point by selectively controlling the amount of lift-gas injected into one or more wells.