CA2385376C

Drawdown apparatus and method for in-situ analysis of formation fluids

Abstract

An apparatus and method capable of incrementally decreasing the borehole pressure at a variable rateby controlling a test volume within the borehole. The systemincludes an incrementally controllable pump, closed loopfeedback and a controller for drawing down the pressure ofa test volume to a level just below formation pressure. Thisincremental drawdown system will significantly reduce theoverall measurement time, thereby increasing drilling efficency and safety.

CA2385376C, drawing sheet 1
Sheet 1 of 24

Term

Term ended

Expired 20 July 2021, 5.2 years ago.

  1. Priority
  2. Filed
  3. Granted
  4. Expired
  5. Today

29 claims: 4 independent, 25 dependent

  1. 1
    CA 02385376 2002-03-20 WO 02/08570 PCT/US01/23011 We claim:1. A method for determining at least one parameter of interest of a formation comprising: (a) conveying a tool into a borehole on a work string, the borehole traversing a subterranean formation containing formation fluid under pressure, the borehole and work string having an annulus between the borehole wall and work string, the annulus being filled with a pressurized fluid containing the formation fluid;(b) sealing a portion of the annulus by extending at least one selectively extendable device disposed on the tool;(c) exposing a port to the sealed portion of the annulus, the port being in fluid communication with a test volume created by (a) and (b), the test volume containing a fluid including the formation fluid;(d) increasing the test volume at a first rate with a volume control device until the test volume pressure falls below formation pressure;(e) sensing at least one characteristic of the fluid using a test device at least twice while the test volume is being increased at the first rate;(f) increasing the test volume at an at least one second rate with the volume control device, the at least one second rate being a non-zero rate;(g) sensing the at least one characteristic of the test volume using the test device at least twice while the test volume is being increased at the at least one second rate;and (h) determining the at least one parameter of interest of the formation using the at least one characteristic sensed during the first rate and at least one second rate. -31 SUBSTITUTE SHEET (RULE 26) CA 02385376 2002-03-20 WO 02/08570 PCT/US01/23011
  2. 10
    A method for determining formation pressure of a subterranean formation, the formation having a borehole drilled therein traversing a reservoir containing formation fluid at the formation pressure, the method comprising:(a) conveying a tool into the borehole on a work string, the borehole and work string having an annulus between the borehole wall and work string, the annulus being filled with a fluid;(b) extending at least one selectively extendable device disposed on the tool to seal a portion of the annulus;(c) exposing a port to the sealed portion of the annulus, the port being in fluid communication with a test volume created by (a) and (b), the test volume containing the fluid, the fluid including formation fluid;(d) increasing the test volume at a first rate with a volume control device;(e) monitoring the pressure of the fluid and volume change rate at predetermined time intervals using a test device at least twice while the test volume is being increased at the first rate;(f) determining when the test volume fluid pressure falls below the formation pressure;(g) changing the rate of volume increase from the first rate to a second rate after the fluid pressure in the test volume falls below the formation pressure, the a second rate being a non-zero rate;(h) allowing the pressure to stabilize at the second rate;(i) changing the rate of volume increase from the second -33SUBSTITUTE SHEET (RULE 26) CA 02385376 2002-03-20 WO 02/08570 PCI7US01/23011 rate to at least a third rate, the at least third rate being a non-zero rate;(j) allowing the pressure to stabilize at the at least third rate;and (k) determine a zero-rate intercept point on a line having a slope and intercept points defined by the monitored stabilized pressures and corresponding rates of (i) through (j), the zero-rate intercept point is indicative of the formation pressure.
  3. 15
    A method for determining formation pressure of a subterranean formation, the formation having a borehole drilled therein traversing a reservoir containing formation fluid at the formation pressure, the method comprising:(a) conveying a tool into the borehole on a work string, the borehole and work string having an annulus between the borehole wall and work string, the annulus being filled with a pressurized fluid containing the formation fluid;(b) sealing a portion of the annulus with at least one selectively extendable device disposed on the tool;(c) exposing a port to the sealed portion of the annulus, the port being in fluid communication with a test volume created by (a) and (b), the test volume containing a fluid including the formation fluid;(d) determining the pressure of the fluid in the test volume with respect to time using a test device;(e) increasing the test volume at a first rate with a volume -35SUBSTITUTE SHEET (RULE 26) CA 02385376 2002-03-20 WO 02/08570 PCT/US01/23011 control device until pressure in the test volume falls below the expected formation pressure;(f) reducing the first rate to a second rate that allows the pressure to rise;(g) using an estimated value for formation pressure;(h) determining an early-time average slope using the value from (g);(i) determining a late-time average slope using the value from (g);(j) calculating a ratio of early-time to late-time slopes;and (k) updating the estimated value of formation pressure and repeating (g) through (j) until the ratio is substantially equal to one, the ratio substantially equal to one indicating a substantially correct guessed value for the formation pressure.
  4. 17
    An apparatus for determining at least one parameter of interest of a subterranean formation, the formation having a borehole drilled therein traversing a reservoir containing formation fluid under pressure, the apparatus comprising:(a) a tool conveyable into the borehole on a work string, the borehole and work string having an annulus between the borehole wall and work string, the annulus being filled with a fluid;(b) at least one selectively extendable device disposed on the tool to seal a portion of the annulus;(c) a port exposable to the sealed portion of annulus;(d) a test volume in fluid communication with the port, the test volume containing at least some formation fluid;(e) a volume control device for varying the volume of the test -36SUBSTITUTE SHEET (RULE 26) CA 02385376 2002-03-20 WO 02/08570 PCT/US01/23011 volume to at plurality of predetermined rates including non-zero rates;(f) a test device capable of sensing at least one characteristic of the fluid at least twice while the test volume is being increased each of the plurality of rates;and (g) a processor capable of using the at least one sensed characteristic to modify each of the plurality of predetermined rates.