Nova Patents
AT533095T

Scheduling Method

Abstract

Are both and a test at least one electronic control system (1) method, the control system (1) (2) (3) connected with the testing device is a data passage, calculated at least one environment model on the testing device (4), and environment model (4) (3) is control system (1) and connected (2) is received an environment model data output of the data passage is the testing device and control system (1) correlation of the control system (1) controls data system. The method comprises overcome the existing technology the known method shortcoming, namely (3) is executing at least one is arranged in the environment model is the testing device (4) and/or an environment model (4) and/or the electronic control system (1) and a test model (5), and test model (5) or the testing device (5a, 5b) relatively independent the function (4) is environment model, and an environment model (4) synchronously wherein the test working end of.

Term

Term ended

Expired 11 September 2026, 0 years ago.

  1. Priority and filed
  2. Granted
  3. Expired
  4. Today

15 members in 6 offices

This recordMember, by publication datePriority claim

Priority claims1

Priority claims
DocumentOfficeKindDate
06018945European Patent Office (EPO)A

Members15

Family members, oldest first
DocumentOfficeKind
EP1898282A1European Patent Office (EPO)A1
CN101149622AChinaA
JP2008070368AJapanA
US2008183456A1United States of AmericaA1
EP2194432A1European Patent Office (EPO)A1
EP1898282B1European Patent Office (EPO)B1
DE502006008342D1GermanyD1
US7933734B2United States of AmericaB2
CN101149622BChinaB
EP2194432B1European Patent Office (EPO)B1
AT533095TThis recordAustriaT
ATE533095T1AustriaT1
JP2014041158AJapanA
JP5495480B2JapanB2
JP5535393B2JapanB2