Nova Patents
AT488793T

Scheduling Method

Abstract

Are both and a test at least one electronic control system (1) method, the control system (1) (2) (3) connected with the testing device is a data passage, calculated at least one environment model on the testing device (4), and environment model (4) (3) is control system (1) and connected (2) is received an environment model data output of the data passage is the testing device and control system (1) correlation of the control system (1) controls data system. The method comprises overcome the existing technology the known method shortcoming, namely (3) is executing at least one is arranged in the environment model is the testing device (4) and/or an environment model (4) and/or the electronic control system (1) and a test model (5), and test model (5) or the testing device (5a, 5b) relatively independent the function (4) is environment model, and an environment model (4) synchronously wherein the test working end of.

Term

No projected expiry on record.

  1. Priority and filed
  2. Granted
  3. Today

Numbers

Application
6018945

Titles2

German
VERFAHREN ZUM TEST EINES ELEKTRONISCHEN STEUERUNGSSYSTEMS
English
METHOD FOR TESTING AN ELECTRONIC CONTROL SYSTEM

Classification

CPC, 4
  • G05B17/02
  • G05B19/0428
  • G05B23/0256
  • G05B2219/23446
Filled: the office’s first classification
IPC, 2
  • G05B17 02
  • G05B19 05